34
TSM DS 50-003/REV.C/031-300-190-003/04-20-07
DS50 TROUBLE SHOOTING MANUAL LEVEL 3
10. TRANSFERRING EEPROM DATA
3)
Adjust the Length Pot: With the system power ON, retract the crane
boom fully. Disconnect the length cable from the boom nose and
carefully allow it to slowly retract until the rubber ball stops against the
standoff at the reel. Turn the slotted potentiometer in the center of the
cable reel CLOCKWISE only until the error E11 is displayed. Pulling
the cable out slightly should display error E05 instead of E11.
Reconnect the length cable to the boom nose.
7.20’ E11 O
0.02 .0 DEG
7.25’ E05 O
0.02 .0 DEG