31
Cantinola Touch 2016 operating and maintenance manual
-
the loading pressure of the boiler must not exceed 1.2 bar and can be detected on the
pressure gauge behind the stove. In addition, the loading pressure of the system can
be checked on the display by pressing for some seconds the key
P6
-
To remove the top panel
PIC.1
-
To open the valve
Pic 2
After the installation check the water and system junctions for leakages, for 2 or 3 days at
least.
If a part of the system piping is located outside the building or if the system has not been used
for some time during winter, it is recommended to add a percentage of heat-carrying fluid, e.g.
water with monoethylene glycol (antifreeze liquid), calculated on the minimum temperature
recorded in the area where the boiler has been installed.
ELECTRICAL CONNECTION
The connection of the boiler to power supply network, 230 Volt, 50 Hz, must be carried out by
the installer. The supplied plug is to be connected to a normal socket having a ground
connection.
The control panel of the boiler is fitted as standard on the left part of the panelling (looking at
the boiler from the front). This can also be moved to the right side. In this case you need to
access to the inner parts of the machine.
Additional requirements of the power supply system are as follows: