background image

Shaking Tower Kit

 ME

-

7018

6

012

-

16515A

Floor Construction

Items Needed Per Floor

Step One: Attach one #3 I-Beam between two Full Round Con

-

nectors.

Make sure that the “cross-bar” on the #3 I-Beam faces out

-

ward.

Step Two: Place the Foam Floor 

between the Half Round Connectors with 

one edge of the floor in the back of the 

#3 I-Beam. 

#3 I-Beams (4)

Truss Set Screws (8)

Foam Floor (1)

Half Round Connectors (4)

Half Round 

Connector

Cross-bar faces outward

Step One

#3 I-Beam

Foam Floor

Step Two

Summary of Contents for ME-7018

Page 1: ...nual 012 16515A 800 772 8700 www pasco com Shaking Tower Kit ME 7018 Included in the Shaking Tower Experiment EX 5555 Mechanical Wave Driver Wireless Load Cell Damping Pendulum Structure Tower Fifth F...

Page 2: ...ver Page shows the Shaking Tower Kit ME 7018 on the left side and the Shaking Tower Experiment EX 5555 on the right side The inset in the middle shows the Damping Pendulum Structure which fits on top...

Page 3: ...e 1 12 Foam Floor 5 4 Nylon Spacer 2 13 Flat F4 Beams 20 5 4 I Beams 1 14 Flat Round Connector 4 6 3 I Beams 24 15 Full Round Connector 5 7 2 I Beams 8 16 Sliding Connector 1 8 1 I Beams 10 17 Half Ro...

Page 4: ...s the additional equipment needed to shake the tower at various frequencies and to measure the force of the shaking at each floor Shaking Tower Kit Construction There are four parts to the Shaking Tow...

Page 5: ...the top vertical slot on a Full Round Connector Attach the beam using the Truss Set Screw 5 Repeat the process to attach the other Flat F4 Beams to the other Full Round Connectors using Truss Set Scre...

Page 6: ...nectors Make sure that the cross bar on the 3 I Beam faces out ward Step Two Place the Foam Floor between the Half Round Connectors with one edge of the floor in the back of the 3 I Beam 3 I Beams 4 T...

Page 7: ...ound Connectors around the Foam Floor using Truss Set Screws as shown Notice that the cross bar on each 3 I Beam faces outward Build More Floors Use the same process to build four more floors for a to...

Page 8: ...four Flat 4 Beams to the Second Floor Use the same process to add the Third Floor to the Fourth Floor and the Fifth Floor to the Fourth Floor NOTE do not add any Flat F4 Beams to the Fifth Floor ME 75...

Page 9: ...xle as the axle is put into the supports Part One Supports for Axle Step One Attach a 2 I Beam to the forty five degree angle slot on each of the Half Round Connectors on the Fifth Floor as shown Note...

Page 10: ...ird put the Full Round Connector on the Axle with the right angle part pointing as shown in the diagram Step Two Assemble the Pen dulum and attach it to the Axle Attach a Flat Round Connector to one e...

Page 11: ...es good con tact with the Axle Step Four Mount the Sliding Connector at the middle of one of the 2 I Beams as shown When the Shaking Tower Kit is shaking the Damping Pendulum is damped by adjusting ho...

Page 12: ...s the Shaking Tower Kit ME 7018 and the follow ing additional items Required but not included 850 Universal Interface UI 5000 PASCO Capstone Software The inset photograph to the right shows the Shakin...

Page 13: ...Kit are available separately However the items are included in other PASCO products Check the PASCO catalog or the web site at www pasco com to find out what is included in each of the PASCO products...

Reviews:

Related manuals for ME-7018