EN
Attach the legs on the other side, install the corner reinforcements (part 6) to the outside in
all four upper corners of the tent and install the foot plates (parts 16, 17, 18, 19). Use the long
ground pegs to fasten the foot plates to the ground. Complete the bottom frame with the
required pipes (parts 2, 5) and connectors (parts 16, 17, 18, 19).
Attach the sidewalls to the frame using the bungees. Attach the endwall directly to the roof
with velcro. Connect the leg covers to the sidewalls and endwalls with velcro. Use the short
ground pegs to fasten the endwalls to the ground. The storm belts run from every corner of
the tent and are fixed to the ground using the spiral pegs.
15
MANUAL ELITE 2.3 & ELITE 2.6
Summary of Contents for 4X10M ELITE 2.3
Page 1: ...3 M ELITE 2 3 ELITE 2 6...
Page 2: ......