3m x 9m Frame Marquee Setup Instructions – Party Warehouse. Page 2 of 4
Raising the Roof:
Step 4 – Attach the feet to the legs, raise the roof and attach the legs one
side at a time. Ensure the legs with the eyelet’s go to the corners. If you
did not attach all the roof straps in the previous step do so now.
Step 5 – Attach the eight small brace bars in each of the corners of the
marquee from the leg to the eave rail.
Walls:
Step 6 – Attach the walls to the roof using the rope that runs around the
perimeter of the roof. Start attaching the walls in one corner with the
pockets facing inside. Working around in one direction hang the walls from
the aforementioned rope keeping the wall taught. This will ensure there is
no bunching of the wall material. The Walls join together with a lace
system, take the top lace and feed trough the top eyelet on the opposing
wall. The next laces goes through the second eyelet, then through the loop
in the first lace and pull down. Repeat this sequence till the bottom of the
wall is reached then tie of the rope at the bottom.
Step 7 – Insert your wall brace bars into the pockets at the bottom of the
legs. They should match up with the feet at the base of the legs, and then
clip them in. You may have adjusted the position of the feet to get clips
inline.
Step 8 – Securing your marquee. If your marquee is on grass, insert
ground pegs through the feet at the bottom of the legs. If there is a rope
attached, tie it off to the peg. If your marquee is on a hard surface use the
concrete blocks provided to secure your marquee to the ground.
Step 9 – Enjoy your function
Dismantling:
To dismantle this marquee complete the erection steps in reverse order.
Make sure that when dismantling the marquee that you pay attention to
the labels on the bags and you put the components in their corresponding
bags. When folding the walls and roof section please try to avoid muddy
areas.