Breaking in engine
Your new engine requires a period of break-in to allow mating surfaces of
moving parts to wear in evenly.
Caution
Failure to follow the break-in procedure could result in reduced engine life or even
severe engine damage.
1. For the first hour of operation: Run the engine at 2000 r/min or at approximately half
throttle.
2. For the second hour of operation: Run the engine at 3000 r/min or at approximately
three-quarter throttle.
3. For the next eight hours of operation: Avoid continuous operation at full throttle for more
than five minutes at a time.
4. Operate the engine normally.
Summary of Contents for F2.6HP
Page 1: ...PARSUN F2 6HP OUTBOARD MOTOR INSTALLATION OPERATION DEMO...
Page 2: ...Please check there is no damage on the carton...
Page 14: ...Check the propeller Propeller Propeller nut Cotter pin...
Page 15: ...Checking the engine oil level Filling nut Oil level check window Filling engine oil...
Page 20: ...5 Put the throttle grip at start position Align the mark MARK...