background image

in

Parking and access control equipment manufactured in the UK

Manual Sliding Gates

Introduction and Warnings

3

/

    

/

20

!

Important Safety Notice

Sliding Gates are designed to Control the flow of vehicular traffic 
primarily. It can be dangerous to allow the passage of 
pedestrians and any other self-powered animal or device to 
utilise this method of access without appropriate warnings and or 
signage.
It may be necessary for the end user of this product to provide 
an alternative, safe method of access to cater for the previously 
mentioned categories.
The end user should fit all necessary signage and warning 
notices to either side of the gate, which should be visible and 
clear from all directions of approach.
The product that was shipped to you was designed with a control 
program to protect all categories from harm or affect this 
however is only a fail safe and should not be modified or 
tampered with by any unauthorised person not sanctioned by the 
manufacturer.

Please sign and date below to say that you have read and 
understood this notice before ANY installation work:

 The “Warnings” leaflet and “Instruction booklet” supplied with this
product should be read carefully as they provide important information
about safety, installation, use and maintenance.
 Scrap packing materials (plastic, cardboard, polystyrene etc) according
to the provisions set out by current standards. Keep nylon or polystyrene
bags out of children's reach.
 Keep the instructions together with the technical brochure for future
reference.
 This product was exclusively designed and manufactured for the use
specified in the present documentation. Any other use not specified in
this documentation could damage the product and be dangerous.
 The Company declines all responsibility for any consequences resulting
from improper use of the product, or use which is different from that
expected and specified in the present documentation.
 Do not install the product in explosive atmosphere.
 The construction components of this product must comply with the
following European Directives: 89/336/CEE, 73/23/EEC, 98/37/EEC
and subsequent amendments. As for all non-EEC countries, the abovementioned
standards as well as the current national standards should
be respected in order to achieve a good safety level.

Information on using
this manual

Ÿ

Read all information thoroughly

Ÿ

Pay attention to all safety advice

Ÿ

Be aware of the symbols (shown above right and
above left) as they have different meanings. One is an
information symbol, the other a warning.

Ÿ

There are many artists impressions of the product in
this manual you should refer to the images as a guide
only. 

Professional CAD

 drawings should be used as

a reference drawing and nothing else. As before every
effort has been made to be 100% accurate in this
manual but we cannot make any guarantees.

Ÿ

As we constantly innovate our products we may
change the quoted spec and any other details that
have been documented in this manual so you should
always refer to the supplier to see if the manual that
was shipped with your product is the latest edition.

Ÿ

Be sure to fill out and complete 

ALL

 paperwork where

instructed as this manual is the equipments log book
and maintenance manual.

 The Company declines all responsibility for any consequences resulting
from failure to observe Good Technical Practice when constructing
closing structures (door, gates etc.), as well as from any deformation
which might occur during use.
 The installation must comply with the provisions set out by the following
European Directives: 89/336/CEE, 73/23/EEC, 98/37/EEC and
subsequent amendments.

This equipment is part of a large range of traffic flow products. Any of the instructions in this manual 
should only be carried out by a qualified service engineer or competent person. The gates are ready to 
bolt down after taking delivery of them. In this manual there is important information on how to do this, 
but most importantly of all how to do this safely. 
The following information is a guide only and whilst we have made every effort to be accurate and 
correct, there may be printing errors be cannot be held responsible for.
With a correct installation you can expect to enjoy many years of reliable service from this product. We 
do however recommend that the product has a bi-annual service carried out by an engineer. Please 
contact our service department to obtain a quote.
Thank you for your custom and welcome to the exciting world of Total Traffic Flow Solutions.

Summary of Contents for PF9000

Page 1: ...ntrol equipment manufactured in the UK PF9000 Manual Sliding Gate Rev 8 3 Manual Barriers Auto Sliding Gates Auto Bi Fold barriers Auto Rising Kerbs Turnstiles Auto Rising Bollards Installation Operation Maintenance Manual ...

Page 2: ...05 06 07 08 11 14 12 INDEX HEALTH SAFETY INFORMATION DELIVERY MOVEMENT TRANSPORT COMPONENT IDENTIFICATION BULLET LOCK GUIDE OPEN CLOSE LOCK SEQUENCE POTENTIAL SYSTEM HAZARD AREAS HANDING FORM INSTALL COMMISSIONING CHECK LIST SERVICE LOG COMMISSIONING CERTIFICATE DECLARATION OF CONFORMITY 13 2 09 10 ...

Page 3: ...ries the abovementioned standards as well as the current national standards should be respected in order to achieve a good safety level Information on using this manual Ÿ Read all information thoroughly Ÿ Pay attention to all safety advice Ÿ Be aware of the symbols shown above right and above left as they have different meanings One is an information symbol the other a warning Ÿ There are many arti...

Page 4: ...thorities LA working in partnership The project aims to reduce injuries and ill health arising from the movement of goods from supplier through haulier to the recipient and end user including any home deliveries The project will focus upon the delivery and collection of goods and the hazards this generates It covers the main areas that cause the majority of injuries and ill health to workers inclu...

Page 5: ... wheels on the opposite side to the hole used on the main tower see below 4 Manually slide the gate into the closed position to fine tune the alignment of the gate with the catch post See Page 6 for details on Manual Release The numbers in the text document below relate to the drawings below You should check that you have received the following in your order as they are referred to throughout this ...

Page 6: ...in an unstressed state 9 Placing a level on the centre of the lower beam or lower rail adjust the rear wheel support until the lower main beam is level Manually pull the gate closed and adjust the cantilever until the gate is level 10 Using a laser square or similar make sure the photo cells from the Main Gate Housing to the Catch Post line up this should be already level as it is governed by the ...

Page 7: ...d If you have any questions please call our technical department The catch post has been fitted with a housing that the above bullet lock fits into On first fitting when the gate is fully open and closed you will need to drill a 12mm hole in the lower gate main beam to receive the end pin of the bullet lock above You will drill straight through dead centre of this to ensure correct alignment When thes...

Page 8: ...injury and or damage to the gate 8 Opening 1 Unlock the gate 2 Twist the handle clockwise to allow the catch bolt to clear the keep 3 Walk the gate to the fully open position ensuring there are no obstacles blocking its path 4 Insert the Bullet Lock into the post locking the gate open 1 Remove the Bullet Lock from the post 2 Walk the gate to the fully closed position ensuring there are no obstacle...

Page 9: ...ential Hazard Areas see diagram 1 2 3 4 5 Additional Comments Descriptions concerning safety on this site Signed Potential System Hazard Areas Please note these are things that you should look out for with the equipment that has been installed on your your customers site This is in no way a health and safety guide just a few key areas for you to be aware of and possibly make future changes to ...

Page 10: ...span of the clear opening Gate length mm PF Quote Refrence Your Order Number Customer Contact No Section 4 b Additional Information Use a separate sheet if necessary Section 4 a Delivery or Install Address Todays Date Required Delivery Date Height of Gate required Spikes Required yes or no Type of Infill Required Section 3 Gate Handing Choice I require a LEFT handed gate shown above I require a RIG...

Page 11: ... the completed conformity certificate All items on the delivery note have been handed over to client site this should be signed for on the separate sheet which is titled Delivery Note green or yellow paper if parts missing call supplier The engineer has expressed the importance of regularly maintaining the equipment Installation Commissioning Check List The following denotes that the above has been...

Page 12: ...0 20 20 This Manual must be completed in accordance with the guidelines below at any point service repair work is carried out on the product This is to achieve two things 1 To keep a history of the product for yourself and your supplier manufacturer 2 To keep an accurate log of any historical or recent modifications and or problems to help an engineer in the event of any future work required on the...

Page 13: ...installed in accordance with the following documents Document Ref Revision Description PF9000A M 5 0 System guides and drawings as defined within O M Manuals Part 4 The following test procedures refer Check Lists pages 15 16 Commissioning Certificate Part 5 Existing Installation Items not covered under warranty This certificate Installers Name On Behalf of Address Signature Date of Signing Position P...

Page 14: ...sential Health and Safety requirements of the Machinery Directive 2006 42 EC and the following transposed harmonised standards BS EN 292 Parts 1 2 1991 BS EN 60204 Part 1 1993 BS EN 294 1992 BS EN 249 1993 BS EN 418 1992 and BSEN13241 1 including other standards BS EN 12445 2008 BS EN 12453 2008 We hereby certify that the machinery stipulated below complies with all relevant provisions of the EC M...

Page 15: ...RONMENT NOXIOUS MATERIALS EUROPEAN MARK CERTIFYING CONFORMITY TO THE ESSENTIAL REQUIREMENTS OF THE STANDARDS 2006 42 EC Proudly Proudly Made Made in the UK in the UK Proudly Made Made using recycled paper The manufacturer reserves the right to make amendments to this manual without prior notice and declines all responsibility for any errors personal injury or damage to property ...

Reviews: