Parking and access control equipment manufactured in the UK
Manual Sliding Gates
We certify that the system covered by this certificate has been commissioned satisfactorily.
Contract Reference
Contract Title
Installation Commenced
/ /20
Completion
Engineers Installing
Commissioning
Works Description
Part/Whole Certificate
Handover Date
Part 3.The system(s) designed and installed in accordance with the following documents:
Document Ref:
Revision
Description
PF9000A/M
5.0
System guides and drawings as defined within O&M Manuals
Part 4.The following test procedures refer:
Check Lists (pages 15 & 16) /Commissioning Certificate
Part 5. Existing Installation Items not covered under warranty/ This certificate:
Installers Name
On Behalf of
Address
Signature
Date of Signing
Position
Parts Handed Over
Qty:
Part 6. Certificate Signing off Section
Client Name
On Behalf of
Address
Signature
Date of Signing
Position
Parts Handed over
Qty:
Commissioning Certificate