background image

Installation Instructions for 4041-5300 Electrical Connection Kit 

for Self-Regulating Bundles

2

Parker Hannifin Corporation

Parflex Division

Ravenna, OH USA

www.parker.com/pfd

NOTE

An HSB (heat shrinkable boot) or 

ESB (end seal boot) or RTV sealant 

is recommended for sealing the 

bundle end.

NOTE

If an HSB (heat shrinkable boot)  

or ESB (end seal boot) is used to 

seal the end of the bundle, the 

boot must be installed prior to 

installing the base of the heating 

cable.

Bundle End Preparation: Used in all connection types.

NOTE

The IEEE standards (515-2004)  

for heating cables require the 

use of GFEPDs with a nominal 30 

milliampere trip level for “piping 

systems in classified areas, those 

areas requiring a high degree of 

maintenance, or which may be 

exposed to physical abuse or  

corrosive atmospheres.”

1

Measure 24 inches from end of 

bundle and carefully cut around 

and lengthwise through jacket and 

insulation. Do not cut into heating 

cable or tubing.

2

Remove jacket, insulation and heat 

transfer foil.

Summary of Contents for Temptrace SL Series

Page 1: ...ing Grommet 4 Stainless Steel Pipe Straps 2 large 2 small 1 3 Hub Box 1 Box Cover 6 Wire Nuts 2 Butt Splice Connectors 1 SK 612 Seal Patch Kit 3 Sleeve Rubber Heating Cable Boot 3 Ring Terminals 2 Cab...

Page 2: ...st be installed prior to installing the base of the heating cable Bundle End Preparation Used in all connection types NOTE The IEEE standards 515 2004 for heating cables require the use of GFEPDs with...

Page 3: ...heating cable to extend beyond sealing grommet for easier power termination Slide the seal grommet over the heating cable and position the grommet in the standoff Note If heater wire is braided only...

Page 4: ...ck of box with ground screw Note One ground screw may be used for both wires if necessary Wrap bus wire connections with fiberglass tape Bus wire connections must not touch inside box otherwise a shor...

Page 5: ...cable end per Heating Cable Preparation steps 1 through 6 5 Parker Hannifin Corporation Parflex Division Ravenna OH USA www parker com pfd 4 Once cable preparation is complete twist junction box onto...

Page 6: ...ble Lightly cut the outer jacket up the center to the end of the heating cable and peal off the outer jacket 2 Push braid back toward outer jacket to create a pucker 3 At the bulge separate the braid...

Page 7: ...re braid CAUTION When cutting heating cable over jacket take care not to cut into bus wires Cutting bus wires may cause electrical malfunctions NOTE Either a hot air gun or propane torch may be used t...

Page 8: ...Bulletin S T II 8 2018 2014 2018 Parker Hannifin Corporation...

Reviews: