English
2 / 6
SPS004-SPS100
2 Introduction
This manual refers to refrigeration dryers designed to guarantee
high quality in the treatment of compressed air.
2.1 Transport
The packed unit must:
• remain upright;
• be protected against atmospheric agents;
• be protected against impacts.
2.2 Handling
Use a fork-lift truck suitable for the weight to be lifted, avoiding
any type of impact.
2.3 Inspection
a) All the units are assembled, wired, charged with refrigerant
and oil and tested under standard operating conditions in the
factory;
b) on receiving the machine check its condition: immediately
notify the transport company in case of any damage;
c) unpack the unit as close as possible to the place of installa-
tion.
2.4 Storage
If several units have to stacked, follow the notes given on the
packing. Keep the unit packed in a clean place protected from
damp and bad weather.
3 Installation
3.1 Procedures
Install the dryer inside, in a clean area protected from direct at-
mospheric agents (including sunlight).
!
The product installed must be suitably protected against fi re
risk (ref. EN378-3).
Y
Comply with the instructions given in par. 8.2 and 8.3.
Y
Pre-fi lter element (for 3 micron fi ltration or better) must be
replaced at least once a year, or sooner as per manufacturer
recommendations.
Y
Do not invert the compressed air inlet and outlet connec-
tions.
3.2 Operating space
Y
Leave a space of 1.0 m around the unit.
Floor
installation
Wall
mounted
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
3.3 Tips
To prevent damage to the internal parts of the dryer and air com-
pressor, avoid installations where the surrounding air contains
solid and/or gaseous pollutants (e.g. sulphur, ammonia, chlorine
and installations in marine environments).
The ducting of extracted air is not recommended for versions
with axial fans.
3.4 Electrical connection
Use approved cable in conformity with the local laws and regula-
tions (for minimum cable section, see par. 8.3).
Install a differential thermal magnetic circuit breaker with contact
opening distance 3 mm ahead of the system (RCCB - IDn =
0.3A) (see the relevant current local regulations).
The nominal current In of the magnetic circuit breaker must be
equal to the FLA with an intervention curve type D.
3.5 Condensate drain connection
If a timed or electronic unloader is installed, use terminals CN
(R1-S1)” (see par. 8.8).
For timed and electronic drains: refer to separate manual sup-
plied with the dryer for specifi c details concerning the conden-
sate drain.
Y
Make the connection to the draining system, avoiding con-
nection in a closed circuit shared by other pressurized discharge
lines. Check the correct fl ow of condensate discharges. Dispose
of all the condensate in conformity with current local environ-
mental regulations.
Y
The drain cannot be left unconnected, and needs to be
connected to ensure the waste is drained into an appropri-
ate site drain system in accordance with local regulations.
Summary of Contents for StarlettePlus-E
Page 2: ......
Page 142: ...8 7 REFRIGERANT CIRCUIT 14 SPS004 SPS100...
Page 143: ...8 8 WIRING DIAGRAM 15 SPS004 SPS100...
Page 144: ...8 8 WIRING DIAGRAM 16 SPS004 SPS100 SPS 004 040 SPS 052 062 SPS 080 100...
Page 145: ...8 8 WIRING DIAGRAM 17 SPS004 SPS100...
Page 147: ......