viii
PSVG-IQAN-C2E1M2W1U1
Safety
Welding after installation
Complete as much as possible of the welding work on the chassis before
the installation of the system. If welding has to be done afterwards,
proceed as follows:
Do not place the welding unit cables near the electrical wires of
the control system.
1. Disconnect the electrical connections between the system and external
equipment.
2. Disconnect the negative cable from the battery.
3. Disconnect the positive cable from the battery.
4. Connect the welder's ground wire as close as possible to the place of
the welding.
Construction regulations
The vehicle must be equipped with an emergency stop which disconnects
the supply voltage to the control system's electrical units. The emergency
stop must be easily accessible to the operator. If possible, the machine
must be built so that the supply voltage to the control system's electrical
units is
disconnected when the operator leaves the operator’s station.
Safety during installation
Incorrectly positioned or mounted cabling can be influenced by
radio signals, which can interfere with the functions of the system.
Summary of Contents for PSVG-IQAN-C2E1M2W1U1
Page 1: ...Parker Gateway for Mobile IoT Solution PSVG IQAN C2E1M2W1U1 User Guide...
Page 10: ......
Page 50: ...40 PSVG IQAN C2E1M2W1U1 Markings Approvals 9 4 EU Declaration of conformity...
Page 51: ...41 Markings Approvals...
Page 52: ...42 PSVG IQAN C2E1M2W1U1 Appendix 10 Appendix...
Page 55: ......
Page 56: ...HY33 5027 IB US...