26
Selecting the Correct Pump for Phastool
®
There are two pumps for installing Phastite
®
connectors with the Phastool
®
3A and 3B: The Battery-Operated Pump
(BP) and the Hand-Operated Pump (HP).
Battery Pump Setup
1. With the pump on a flat and stable work surface, remove
all dust caps from the hose, tool and pump quick
connects.
2. Connect the hose to the pump’s hydraulic outlet using
the quick connect (Figure 27).
3. Connect the downstream side of the hose to the tool’s
hydraulic inlet using the quick connect.
4. Check all system fittings and connections to be sure they
are tight and leak free.
5. Link the digital touch screen controller to the pump via
the connecting lead (Figure 28).
6. Install the battery onto the pump at the rear.
NOTE:
Ensure that the quick links provided are fastened
between the hose containment hoops and mounting
bracket (there are 2 quick links for each end of the hose)
(Figure 29).
Not ATEX Certified
Battery Operated Hydraulic Pump (BP
)
Part Number:
PH-3-BP
Weight:
20 lbs (9 Kg)
Reference Manual
Document Number L4004 (Instruction Manual)
Figure 27
Figure 28
Figure 29
Summary of Contents for Phastite PH-4-PS
Page 1: ...Phastite Tube Connectors Installation Manual BULLETIN 5909...
Page 33: ...41 42 Notes Notes...
Page 34: ......