![background image](http://html1.mh-extra.com/html/park-warehouse/685se605/685se605_installation_3693830002.webp)
2
9. After the net tension has been released, loosen the
Slider Bar
(B) and (C) locking knobs to allow the
Slider
Bars
(B) and (C) to freely move up and down. Adjust
VB1250K Net
(G) to desired height. Once the top of
the
VB1250K Net
(G) is at the desired height, tighten the
Slider Bar
(B) and (C) locking knobs and net top
tension crank. See Figure 1.
10. Once the
VB1250K Net
(G) is locked and tensioned at the desired height, install the
Height Labels
(D).
Line up the appropriate line on the
Height Label
(D) with the machined height indicator mark on the
Slider
Bars
(B) and (C). Use a credit card or something similar to smooth all air bubbles from
Height Labels
(D).
11. Install padding and antennas.
Caution!
The VB1250K net is designed to fit Bison Match Point installation with pole locations between 34’ and 40’
by customizing the length of the top rope. Tie a loop in one end of the top rope at a location that allows
proper tensioning. Do Not cut the excess rope until you are confident you have the correct length. Length
will depend on the distance between the standards. Nets cannot be returned after unwrapping. Call Bison
Customer Service for assistance at #800-247-7668.
Figure 1
Summary of Contents for 685se605
Page 3: ...3...