background image

DELTA PLUS 

 

Bariatric Mattress Replacement System 

Service Manual 

Summary of Contents for Delta Plus

Page 1: ...DELTA PLUS Bariatric Mattress Replacement System Service Manual...

Page 2: ...STRUCTION 5 4 ALL PARTS ILLUSTRATION 6 5 OPERATING TROUBLESHOOTING SERVICE OVERVIEW 5 1 Service checklist 7 5 2 Service repair procedures 8 6 PUMP ASSEMBLY 6 1 Pump exploded view Diagram 1 16 6 2 Base...

Page 3: ...2 1 Product View Illustration 1 1 Front View Side View I Side panel assembly Front View Control panel 1 2 Side View...

Page 4: ...3 Side View II Air outlet quick connector assembly 1 2 Rear View Rear View Pump hanger 2sets Air intake filter Enclosure screws x 6 Brief Operating Instructions...

Page 5: ...4 2 Brief Operating Instructions...

Page 6: ...tected prior to repair Attention Before commencing the repair please check the following CPR is fastened securely See Fig A For all the required replacement parts please contact Park House Healthcare...

Page 7: ...6 4 Internal Parts Illustration...

Page 8: ...T2 Check the control panel power switch fuses and compressor assembly Solution Replace the fuse T3 Solution Replace the power switch T2 Solution Replace the compressor T5 Compressor is not functionin...

Page 9: ...he timer and control panel Solution Replace the timer T6 Mattress unable to lower the air pressure Solution Replace the control panel T1 Conduct a pump pressure test T7 Incorrect pressure detected Sol...

Page 10: ...he connection of both power and control panel terminals is tight if any disconnected terminals are found refer to diagram 4 for instructions on how to reconnect 1 Remove the control panel from the PCB...

Page 11: ...e then replace with a new power switch Procedure 1 Remove the side panel assembly 2 Remove the power switch wiring terminals 3 Remove the power switch by squeezing and pressing forward 4 Replace with...

Page 12: ...new fuse if damaged Procedure 1 Remove the fuses with appropriate tooling 2 Replace with the new fuses 3 Use an appropriate screwdriver to screw the fuses back into the side panel assembly 4 Before s...

Page 13: ...the unit The blacker the filter material the dirtier the filter is Procedure 1 Remove the air filter cap from the pump enclosure 2 Remove the air filter from the enclosure 3 Insert new air filter unit...

Page 14: ...s from the control panel PCB 3 Use appropriate tools to unscrew U Shape compressor bracket by twisting open the screw washer 4 Pull out the compressor rubber tips from the U Shape bracket each compres...

Page 15: ...tes the pointing arrow found at the air chamber plate will touch the micro switch as OPEN position If untouched it is short circuit and the multi meter will sound off 3 3 If the timing motor does not...

Page 16: ...LED light will light up when the correct pressure is reached 5 Check that the pressure has reached the required level 6 If an incorrect pressure is detected follow the problem checklist below A Leaks...

Page 17: ...16 6 Pump assembly 6 1 Pump exploded view diagram Diagram 1...

Page 18: ...17 6 2 Base exploded view diagram Diagram 2...

Page 19: ...18 6 3 Side panel assembly exploded diagram Diagram 3...

Page 20: ...19 6 4 Control panel PCB diagram Diagram 4...

Page 21: ...ch 07 F376A01 0000 Air Connector assembly 08 371001 0000 Case 09 F375B07 0000 Silicone tubing assembly 10 F375B08 0000 Silicone tubing assembly 11 F375B12 0000 Silicone tubing assembly 12 F375B09 0000...

Page 22: ...nd the country Park House Healthcare is a respected member of the British Healthcare Trade Association and has BS EN ISO9001 2000 and EN46002 accreditation which is the specific quality standard for M...

Reviews: