background image

Make sure dowels and panels are tight before 

screwing surface and PVC panels in place. Surface 

holes are already pre-drilled. Use 20 – 1” screws for 

attaching surface and PVC panels Diagram 1b.

Attach legs using 4 – ¼” x 2-3/4” lag bolts (per leg). 

Line up legs with the mounting holes. Tighten using 

allen wrench provided Diagram 2a.

Attach both goals and ball return boxes lining them 

up with the pilot holes. Use ¾” screws, and connect 

goals and ball return with black hose Diagram 2b.

Using two people, carefully lift and stand the table 

upright. Do not exert excessive side pressure on the 

legs while rotating the table.

 

Player Rod Installation

Attach handles to player rods. 

Line up hole on player rod end 

with hole on handle. Attach with the ¾” flat head.

Once handles are attached to the player rods, insert player rods ac

-

cording to the Diagram 3 below. Start with one color first and work your 

way from the goalie to the last player rod. Do not slide the player rod 

through both sides at this time.

 

Goalie Bar Assembly

In the following order, place hardware on the goalie player rod:  Bushing, washer, stopper, player, stopper, 

washer, bushing see Diagram 3b.
Insert player rod to opposite side panel and slip on the protective end cap.
Line up the stopper and player; hold and attach appropriate bolts and nuts.
Note:  Only the goalie player rod uses stoppers.

Player Bar Assembly

In the following order, place hardware on the player rods:  

Bushing, washer, appropriate player (refer to game table 

player layout), washer, bushing.

Insert player rod to opposite side panel and slip-on the protective end cap.
Line up the players; hold and attach appropriate bolts and nuts.
Repeat for remaining rods.

Reviews: