12
1.
Remove Clamp
2.
Lift off dome (save 0-ring)
3.
Remove pressure gauge and T-handle from inside valve
housing assembly.
4.
Pipes and valve base should be treated with primer.
5.
Make sure pipes are glued all the way into the stop. Be
careful not to allow glue to run into module area.*
6.
The center port is the inlet to the valve and should be
approximately 3" longer than the perimeter pipes.
7.
Allow 24 hour before pressure testing.
8.
Reposition o-ring in groove in the valve base.
9.
Replace dome and V-Clamp and tighten until snug.
10.
Thread the pressure gauge to the top of
the dome. DO NOT USE TEFLON TAPE
11.
Pressurize with pool plumbing (do not exceed
35 psi.)
12.
Store the module assembly in a safe place
and install after the pool has been started up.
*
Pipes should be a minimum of 12" in length and should
insure the valve be at least 6" above water level.
Gluing Instructions
INSTALLATION
VALVE FOR 5-PORT SYSTEM
1
2
3
4
5
6
SIDE VIEW
TOP VIEW
FOR A 5-PORT SYSTEM, ZONES 1 AND 3 ARE TIED TOGETHER