With Pressure Plugs
Pressure should remain on the system through
construction until right before filling with water.
4" PLUG
2 1/2" PORT
2" HYDROSTAT PLUG
MDX-R3 PRESSURE TESTING
Pressure Test-READ BEFORE INSTALLATION:
New Style Test Plug
The 4” pressure test plugs (005-252-1610-00)
use an o-ring to make the seal.
Wrap once with Teflon tape to prevent plastic
threads from binding. Insert plug into threaded
socket. Use an adjustable wrench, a 1½” 12pt
socket or pliers on lug and tighten by hand until
snug. Over tightening may cause parts to break.
SUMP INSTALLATION
SUMP INSTALLATION TO SHELL BEFORE SETTING POOL
Fig. 7
1.
Sand and clean this bottom surface area well
(see arrow). This is where the gasket will seal.
(Fig. 7)
2.
Glue gaskets to the face of the sump with
RTV Silicon glue. Be sure to line up all gasket
holes with the corresponding hole in the
sump.
(Fig. 8)
TO POOL WALL
SCREW HOLES
Fig. 8
Assemble the Drain PRIOR to Adding Water -
See Illustration on Page 9:
1.
Remove 4” pressure plug.
2.
Install funnel assembly (#3) onto sump (#9) and
secure with 4 (four) security screws (#2) with
screw driver security T25 (#24).
Fig. 9
3.
Line up ninety of the sump to face the side of
the pool. Using two people or by reaching
thru from the inside of the pool position the
sump so the screw holes line up keeping the
sweep ninety facing the side of the pool.
Using the 12 flathead screws affix the sump to
the mounting ring.
(Fig. 8)
3.
Install the cover (#1) onto the funnel assembly
(#3) and secure with 3 (three) security screws
(#2).
Release pressure on the
system before removing plugs
WARNING
Summary of Contents for MDX-R3
Page 12: ......