background image

To our valued customer,

Thank you for choosing a                      product by

Manufacturing Solutions. We are pleased that we are able to provide equipment to 

make your work easier.

Our efforts are focused on producing the finest quality equipment of which we 

are capable. We make sure to spend extra time and effort on our design and produc-

tion in order to reduce your time and effort spent using the product.

We take pride in providing the best for our customers. Quality, innovation, and 

excellence are all qualities this company ensures. No product is sent without being 

factory tested and inspected to ensure the highest quality for you.

It all began in 1972 when Roland Young designed our first product, the PANEL-

LIFT® Brand Drywall Lift, and revolutionized the drywall industry. To this day we are 

continuously making advancments in manufacturing and design.

Thank you again for giving us the opportunity to work with you. Any questions 

or comments that you have are always welcome.

Summary of Contents for CABINETIZER 72

Page 1: ...l BEFORE operating unit Before operating this equipment thoroughly read this set of instructions make sure you understand them and only then follow the step by step directions Failure to do so could r...

Page 2: ...he product We take pride in providing the best for our customers Quality innovation and excellence are all qualities this company ensures No product is sent without being factory tested and inspected...

Page 3: ...RE FOR ILLUSTRATIVE PURPOSES ONLY Warning Instructional Information Page 1 User Components Page 2 Replacement Parts Parts List Page 3 5 Assembly Page 6 7 Operation Page 8 Accessories Page 9 Safety Pag...

Page 4: ...nd the load and possibly resulting in serious property damage and or serious bodily injury DO NOT ROLL a loaded Cabinetizer Cabinet Lift while the load is raised Always keep the load lowered until the...

Page 5: ...nd top boom rollers Take reasonable care to avoid damaging the Cabinetizer Cabinet Lifter when transporting it Do not transport the Cabinetizer while it is assembled Do not hammer on any members or co...

Page 6: ...72 05 72 09 72 08 72 07 72 16 72 17 72 18 72 19 Replacement Parts 3...

Page 7: ...72 15 72 14 72 12 72 11 72 13 Replacement Parts Cont 4...

Page 8: ...Collar Handle 72 16 Complete 2 Piece Split Boom w Connector 72 17 1 2 Boom Tube 72 18 Split Boom Connector 72 19 Top Roller Assembly 72 05 Complete Dolly Base 72 06 Dolly Base Frame with Brake Clamp...

Page 9: ...ly is oriented on the same side as the longer base legs as shown 4 Insert the split boom connector Align the set screws with the access holes in the boom tube 5 Fit the second boom section over the sp...

Page 10: ...sections into the Counter Base 3 Let out a 2 loop of strap on the Collar Assembly and slide the Collar Assembly over the Boom Tube MAKE SURE the seat of the Collar Assembly is orientated on the same...

Page 11: ...Base Configuration to install upper cabinets first before base cabinets are in place 1 Load cabinets onto lift 2 Operate the winch to raise cabinets into place Lock the brakes on the casters and leve...

Page 12: ...r cabinets into place even faster and smoother with the Drill DriveTM winch option 1013 for your CabinetizerTM Call 1 800 448 0822 or email sales paragonpromfg com for more information 9 Optional Acce...

Page 13: ...Arsenic Cadmium Chromium Ethylbenzene Lead Methanol Methylene Chloride Dichloromethane Nickel Propylene glycol monobutyl ether Toluene Carbon Black Cancer Developmental Cancer Developmental Cancer Ca...

Page 14: ...O MANUFACTURING SOLUTIONS INC reserves the right to make changes or improvements in design without incurring obligation to install the same on previous units PARAGON PRO MANUFACTURING SOLUTIONS INC sh...

Page 15: ......

Page 16: ...Questionsabout assembly Can t find a part Need some other help Call us 1 800 448 0822 701 775 0551 We ll get you set up...

Reviews: