V e r i f i c a t i o n
205
C
H A P T E R
C
HAPTER
8
V
ERIFICATION
This chapter describes how to verify that the 2000 Series IADs operate
properly after installation. It also covers maintenance and how to display the
current configuration. Before you can test the voice capabilities of the IAD,
you must first provision it at the voice gateway and configure the voice
application and parameters.
Power-up Test
The IAD displays an indication of normal operation when you first power it
up. When you power it up, verify that the POWER indicator on the front
panel lights green.
Operational Test
Follow the procedure below to verify that the IAD is operating properly after
installation. This procedure assumes that
•
You have configured Directory numbers (DNs) in the Class 5 switch for the
associated Voice Ports.
•
The IAD has been connected to a terminal emulator via the console port,
displays the normal boot sequence and you can log in.
•
You have configured PVCs at the DSLAM (default data = 0, 38; default
voice is 0, 39) when using ATM.
•
You have provisioned a data network.
•
You connected and configured a WAN link at the associated DSLAM or
voice gateway. For more information, see
WAN Configuration
on page 4-45.
•
You have a PC with Telnet, and an Ethernet adapter running TCP/IP. For
more information, see
Connecting via Telnet
on page 2-19.
•
For testing, you and a counterpart logged on to the upstream voice gateway
can communicate via telephone or cell phone.
Summary of Contents for JetFusion 2100 Series
Page 8: ...vi 2 0 0 0 A 2 G B 2 3 0 0 ...
Page 20: ...xxiv 2 0 0 0 A 2 G B 2 3 0 0 ...
Page 32: ...10 2 0 0 0 A 2 G B 2 3 0 0 ...
Page 218: ...196 2 0 0 0 A 2 G B 2 3 0 0 ...
Page 226: ...204 2 0 0 0 A 2 G B 2 3 0 0 ...
Page 230: ...208 2 0 0 0 A 2 G B 2 3 0 0 ...
Page 232: ...210 2 0 0 0 A 2 G B 2 3 0 0 ...
Page 296: ...274 2 0 0 0 A 2 G B 2 3 0 0 ...