background image

496-15149

 14

Center-Mounting the 8610 Chassis in a Rack

"

Procedure

To center-mount the 8610 chassis in a rack:

1. Determine the preferred placement of the 8610 chassis in the rack. Then, mark the

appropriate locations for the mounting screws on the rack.

2. Reposition the mounting brackets to the center-mount position using the four #8-32

screws supplied with the chassis.

3. Fasten the chassis to the rack. Insert the screws through the rack and into the two

screw holes located in the center of each side of the chassis.

Repeat these steps for each succeeding 8610 chassis.

Complying with NEBS 

The following must be taken into consideration for compliance with Network Equipment-
Building System (NEBS) requirements.

Connection to the CO Ground Lug

"

Procedure

1. Strip back the insulation approximately 1/4- to 3/8-inch on 14 AWG copper wire.

2. Loosen the screw on the GND lug located on the rear surface at the center of the

Hotwire 8610 DSLAM cover.

3. Insert the stripped end of the wire into the open end of the GND lug and tighten the

lug’s screw. Make sure it is making contact with the stripped portion of the wire.

ESD Wrist Strap Jack

A noninsulated banana jack is located at the left front side of the Hotwire 8610 DSLAM
to provide a ground for the ESD wrist strap’s plug.

!

HANDLING PRECAUTIONS FOR STATIC-SENSITIVE DEVICES

This product is designed to protect sensitive components from 
damage due to electrostatic discharge (ESD) during normal 
operation. When performing installation procedures, 
however, take proper static control precautions to 
prevent damage to equipment. If you are not sure 
of the proper static control precautions, contact 
your nearest sales or service representative.

Summary of Contents for HOTWIRE 8610 DSLAM

Page 1: ...HOTWIRE 8610 DSLAM INSTALLATION INSTRUCTIONS Document No 8610 A2 GN10 10...

Page 2: ...manual Warranty Sales Service and Training Information Contact your local sales representative service representative or distributor directly for any help needed For additional information concerning...

Page 3: ...able at www paradyne com Select Library Technical Manuals Hotwire DSL and MVL Systems Select one of the following documents 8000 A2 GB22 Hotwire Management Communications Controller MCC Card IP Conser...

Page 4: ...mer Premises Installation Instructions What is the Hotwire 8610 DSLAM The Hotwire 8610 Digital Subscriber Line Access Multiplexer DSLAM which can be installed in the CO or at a customer location adjac...

Page 5: ...eroperates with the 5620 Remote Termination Unit RTU 8540 Digital Subscriber Line DSL card that interoperates with either the 5216 or 5246 Remote Termination Unit RTU 8546 DSL card that interoperates...

Page 6: ...ervice will be disrupted The base system is connected to additional systems by connecting the 8 pin modular expansion cable provided from the OUT port of the base chassis to the IN port of the next ch...

Page 7: ...DSL card thus housing up to three DSL cards H One Management Control Processor MCP card The Hotwire 8610 DSLAM requires one MCP card mounted in Slot 1 of the base or first chassis in a stack The MCP...

Page 8: ...ground for the ESD wrist strap plug H Stacking Up to three 8610 chassis may be physically stacked safely on top of each other However for stacks of more than three start a second stack or mount in a...

Page 9: ...remove the 8610 chassis from its shipping container and check for physical damage If the 8610 chassis shows signs of shipping damage report this immediately to your shipping and sales representatives...

Page 10: ...2 3 6 5 4 1 AC IN PUT 1 2 3 ES D ES D 48 VD C CL AS S 2 OR LIM IT ED PW R SO UR CE 48 V A RT N A B B A B DC FU SE S T4 A MI N 48 V PW R A AL M FA N B OU T IN SE RI AL AL M IN TF MCP 1 2 3 MCP DS L MAN...

Page 11: ...t Up to three 8610 chassis can be stacked on a table or desktop Mounting brackets are provided for mounting in 19 or 23 inch racks You will need a large flat blade screwdriver and a Phillips screwdriv...

Page 12: ...chassis behind the foot and up the side of the unit 3 Plug the other end of the 8 pin modular cable into the Management IN port of the 8610 chassis above dressing the cable as in the previous step 4 R...

Page 13: ...1 AC INPUT 1 2 3 ESD ESD 48VDC CLASS 2 OR LIMITED PWR SOURCE 48V A RTN A B B A B DC FUSES T4A MIN 48V PWR A ALM FAN B OUT IN SERIAL ALM INTF MCP 1 2 3 MCP DSL MANAGEMENT 10 BASE T STACK POSITION 2 3...

Page 14: ...front screws on each side of the unit You will reuse these screws to secure the mounting brackets to the 8610 chassis For a 19 inch rack installation the notched flange of the mounting bracket is plac...

Page 15: ...tion the smaller flange of the mounting bracket is placed against the side of the 8610 chassis 2 Determine the preferred placement of the 8610 chassis in the rack 3 Slip a Speed Nut onto each rail hol...

Page 16: ...Procedure 1 Strip back the insulation approximately 1 4 to 3 8 inch on 14 AWG copper wire 2 Loosen the screw on the GND lug located on the rear surface at the center of the Hotwire 8610 DSLAM cover 3...

Page 17: ...e not powered i e the circuit breakers are open The ends of the power source wires 14 18 AWG solid or stranded wire must be stripped of insulation If the wires are not stripped strip the tip of each w...

Page 18: ...stranded wire must be stripped of insulation to about 1 2 inch in length before plugging the wires into the appropriate terminal on the 48V input terminal block Ensure that each wire is fully inserted...

Page 19: ...to the 8610 chassis using a single ac power source 1 Plug the ac power cord into the IEC 320 receptacle labeled AC INPUT 2 Plug the other end of the ac power cord into your ac power outlet NOTE The ac...

Page 20: ...ssis to the left and behind the front left support foot 4 Plug the other end of the ac power cord into the ac outlet 5 Power the Hotwire 8610 DSLAM chassis 6 Make sure the PWR A and PWR B LEDs on the...

Page 21: ...e filler plate from the slot by unscrewing the mounting screws at each end 2 Hold the card horizontally with the components on top and insert it into the left and right card guides of the slot of the...

Page 22: ...urce and a 48 Vdc power source then both the PWR A and PWR B LEDs must be ON H The yellow FAN ALM LED on the front panel must be OFF H Also check the SYSTEM LEDs on the MCP and DSL cards if you have n...

Page 23: ...bag with the unit Do not insert the screw past the connector body until Step 5 3 Plug the Telco 50 pin cable into the appropriate connector for the slot containing the card labeled 1 2 or 3 on the rea...

Page 24: ...eft leg 3 Plug the other end of the cable into your Ethernet hub or switch connector 99 16323 To Hub Connector 10 BASE T 2 IN OUT SERIAL ALM INTF MCP 1 MANAGEMENT 3 STACK POSITION 2 3 6 5 4 1 Connecti...

Page 25: ...8610 chassis to the left and behind the left support foot 3 Plug the other end of the cable into the terminal or laptop computer serial port using the appropriate DB25 or DB9 adapter that is supplied...

Page 26: ...mple AT D0 Procedure To connect the Hotwire 8610 DSLAM chassis to a dial up modem 1 Connect an 8 pin modular plug ended serial cable into the MANAGEMENT SERIAL port of the Hotwire 8610 2 Dress the ser...

Page 27: ...Troubleshooting Symptom Possible Cause Solutions Either the PWR A or PWR B LEDs or both are OFF Failure in a single chassis within a stack No power 1 To clear the power alarm remove the power from th...

Page 28: ...hub or switch is OK Check cables to the hub and make sure connection is made properly Remove the DSL card from the slot and reinstall the card into another slot Replace the DSL card MCP has a slot nu...

Page 29: ...Instructions LED LED is Indicating PWR A Green Off Normal operation for Power Source A Low high or no voltage for Power Source A PWR B Green Off Normal operation for Power Source B Low high or no volt...

Page 30: ...ber Use 1 Not used 2 Closed on major alarm 3 Common on major alarm 4 Open on major alarm 5 Closed on minor alarm 6 Common on minor alarm 7 Open on minor alarm 8 Not used 8 Pin Modular LAN WAN Slot Con...

Page 31: ...Mgt Data 3 Fan Alarm 4 Ground 5 Power Alarm A 6 Power Alarm B 7 Mgt Clk 8 Mgt Clk 8 Pin Modular Serial Asynchronous Terminal Connector The 8 pin serial connector for asynchronous terminal interface DC...

Page 32: ...s 1 and 2 are shorted together 2 shorted together 3 Data Terminal Ready 20 4 Signal Ground 7 5 Receive Data 3 6 Transmit Data 2 7 Clear to Send 5 8 Request to Send 4 DB9 Adapter Pinouts The female DB9...

Page 33: ...each of these interfaces NOTE When the 8610 chassis is the base chassis the MCP is installed in Slot 1 and the Tips and Rings for Slot 1 are not connected internally and are not active CONN for Slots...

Page 34: ...e 8 pin modular jack for the Alarm Relay Interface connection Power Two versions of the Hotwire 8610 DSLAM chassis are available an ac power version and a dc power version The ac version can be connec...

Page 35: ...duct version is intended to be used with a 3 wire grounding type plug a plug which has a grounding pin This is a safety feature Equipment grounding is vital to ensure safe operation Do not defeat the...

Page 36: ...uits take the following precautions Never install telephone wiring during a lightning storm Never install telephone jacks in wet locations unless the jack is specifically designed for wet locations Ne...

Page 37: ...ompliance with the above conditions may not prevent degradation of service in some situations Repairs to certified equipment should be coordinated by a representative designated by the supplier Any re...

Page 38: ...nded by Directive 93 68EEC H Directive 89 336 EEC Council Directive of 3 May 1989 on the approximation of the laws of the member states relating to Electro Magnetic Compatibility EMC as amended by Dir...

Reviews: