background image

 11

Connecting to the Network

Now that the FrameSaver unit is set up, the unit can be connected to the network.

1. Insert the 8-pin connector of the network cable into the network interface,

NET (S/T).

2. Insert the other end of the cable into the S/T interface of the NT1.

00-16677

NT1

S/T Interface
(ITU-T I.430)

NOTE:

After connecting the network cable, wait about a minute to allow
Auto-Configuration a chance to discover the operating rate and the DLCIs.

3. Check that the Network (NET OK) LED is on. If it is, the network interface is set up

correctly and it is operational. If not, make sure both ends of the network cable are
properly seated.

4. Check Health and Status messages in the left column of the System and Test

Status screen to see the LMI status and verify that LMI is up.

Main Menu

Status

System and Test Status

If 

LMI Down, Net1-FR1

 appears for more than three minutes, or any other

network-related status message appears, refer to the status information in
Operation and Maintenance of the User’s Guide for possible reasons.

Summary of Contents for FrameSaver SLV 9664

Page 1: ...you need reducing the waste of surplus printing It also helps us maintain competitive prices for our products Complete documentation for this product is available at www paradyne com Select Library T...

Page 2: ...installing the unit Follow the same guidelines below when installing the wall mounting Contact your sales representative to order this feature Before starting the installation make sure you have A de...

Page 3: ...ters 3100 F2 910 035 0315 1431 Equipment with X 21 interfaces DB15 connectors X 21 DTE adapter cable EIA 530A to X 21 1 foot 3 meters 3100 F1 571 035 0302 0131 Equipment with V 35 interfaces MS34 conn...

Page 4: ...ove the POWER jack Make sure the locking tab snaps securely into the jack 00 16655 Power Cord Transformer O K A L M Locking Tab Grounded Power Outlet 2 Insert the socket end of the power cord into the...

Page 5: ...none Stop bit set to 1 Flow Control set to None 2 Insert the DB25 end of the EIA 232 cable into the FrameSaver unit s COM port 00 16656 To Connect to a PC or Async Terminal COM Port 3 Insert the other...

Page 6: ...1 From the Main Menu press the down arrow key twice so the cursor is on Configuration 2 Press Enter to display the Configuration menu The Load Configuration From menu appears 3 Press Enter to select C...

Page 7: ...820 or 9128 NMS Headquarters in City A Port NET NT1 NET Port Frame Relay Router Remote Site FrameSaver 9664 DLCI EDLCIs 100 0 User Data 100 2 Management Data Branch Office in City B NTU NET Port Frame...

Page 8: ...the power cord The unit will perform the self test again If the failure reappears call your service representative for assistance Setting the System Clock To set up the system clock 1 Select System In...

Page 9: ...ct the appropriate Port Type 3 Press Ctrl a and Save your change s 4 Return to the Configuration Edit Display menu 5 Repeat Steps 2 through 4 for the data port Main Menu Configuration Data Ports Physi...

Page 10: ...ed in the network DLCI NOTE When auto configuration creates a multiplexed DLCI but a standard DLCI is needed change the DLCI to standard from the network DLCI Records screen Configuration Network DLCI...

Page 11: ...er the operating rate and the DLCIs 3 Check that the Network NET OK LED is on If it is the network interface is set up correctly and it is operational If not make sure both ends of the network cable a...

Page 12: ...ect DLCI Records on the network interface Configuration Network DLCI Records 2 Select Modify The Modify DLCI Record for DLCI Number prompt appears 3 Select the DLCI that will be used by pressing the s...

Page 13: ...g the End to End Path After installation of a remote site unit run an IP Ping test to Ping the NMS at the central site and verify that the entire path from the remote unit to the NMS is functioning To...

Page 14: ...678 DTE 4 Check that the Port OK LED is on If it is the port is set up correctly and it is operational If not make sure both ends of the cable are properly seated and secured 5 Check Health and Status...

Page 15: ...the DLCI s status Check PVC Connections Check PVC connections to verify that all PVCs including management PVCs are configured and to see whether the PVC is active or not 1 Return to the Status menu...

Page 16: ...16 FrameSaver 9664 Front Panel 00 16658 O K O K A L M T S T O K 9664 PORT FrameSaverTM SLV FrameSaver SLV NETWORK FrameSaver 9664 Rear Panel 00 16657...

Page 17: ...lable certified for use in the country of installation Paradyne power supply part number 327 0107 0031 is recommended This power supply includes a special mating connector for connection to this equip...

Page 18: ...specifically designed for wet locations Never touch uninsulated telephone wires or terminals unless the telephone line has been disconnected at the network interface Use caution when installing or mod...

Page 19: ...ended by Directive 93 68 EEC H Directive 91 263 EEC Council Directive of 29 April 1991 on the approximation of the laws of the member states concerning telecommunication terminal equipment including m...

Page 20: ...tside the U S A call 1 727 530 2340 Document Feedback We welcome your comments and suggestions about this document Please mail them to Technical Publications Paradyne Corporation 8545 126th Ave N Larg...

Reviews: