18
9580-A2-GZ40-10
June 1999
Test the System
Tests are started and stopped from the Test branch of the ATI.
"
Procedure
To access the Test branch:
1. Follow this menu selection sequence:
Main Menu
→
Test
2. Use the Tab key to select Abort All Tests or the test you would like to initiate,
then press Enter.
Select . . .
To . . .
Physical Tests
Start and stop a physical test.
Port-
n PVC Tests
Start and stop a Permanent Virtual Circuit (PVC)
test in the direction of the DTE for a DLCI on
Port-1 or Port-2.
Network PVC Tests
Start and stop a PVC test in the direction of the
network.
IP Ping
Display the menu for running the PING function.
LED Test
Perform a lamp test.
VCC Performance Monitoring
Select Virtual Channel Connections (VCCs) for
monitoring.
VCC Loopback and RTT
Estimation
Send test cells to the remote end of the ATM VCC
to estimate Round Trip Time (RTT).
Abort All Tests
Abort all active tests except DTE-initiated and
network-initiated tests.
If Test Timeout is enabled, user-initiated loopback and pattern tests end after the
number of minutes specified in Test Duration. If Test Timeout is disabled, tests
run indefinitely.
*9580–A2–GZ40–10*
Copyright
E
1999 Paradyne Corporation