2. BitStorm 1900 Installation and Testing
1900-A2-GN20-00
BitStorm 1900 Installation and Maintenance Guide
2-45
Step
Procedure
(continued)
Figure 2-6: BitStorm 1900 Shelf Fastened to Bay
5.)
Proceed according to the following table:
If the application is
Then
Voice/data
Align and mount a filter shelf directly above the Bit-
Storm 1900 shelf as shown in Figure 2-7, "Filter
Shelf Mounting in Bay," on page 46.
Data-only
Do not install the filter shelf.
NOTE: For a Data-only application: Stop here. You have
completed the task.
02-17178
Shelf Mounting Screw (4)
Shelf Ground Stud
Side Flange
Bay
Summary of Contents for BitStorm 1900
Page 12: ...List of Tables viii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Page 16: ...About This Document xii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Page 48: ...1 BitStorm 1900 IP DSLAM 1 32 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...