17
FIGURE 20
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
71
19
69
73
20
68
32
69
17
24
STEP 20
• Assemble two 3/4” THRUST WASHERS (68) and two PEC
CAMS (24) to the LEFT (20) & RIGHT (19) PEC ARMS, as
shown on FIGURE 20.
• Insert four 3/4” FLANGE BEARINGS (69) into the bushings
of the BEARING HOUSING (17).
• Insert the LEFT (20) & RIGHT (19) PEC ARMS through the
3/4” FLANGE BEARINGS (69) in the BEARING HOUSING
(17) on their respective side as shown, and secure them in place
with two 3/4” STARLOCK COLLARS (73).
• Slide two PEC DEC ROLLER PADS (32) onto the LEFT (20)
& RIGHT (19) PEC ARMS until the ROLLER PAD (32) is
flush with the bottom of the pec arms.
•
(NOTE: If a lubricant is required coat the inside of the
ROLLER PAD (32) with rubbing alcohol or water. Also,
rotating the pad while pushing up will help ease assembly.)
• Securely assemble two 3/8” SPRING PIN ASSEMBLIES (71)
to the spring pin barrels of the PEC ARMS (19 & 20).