• If upon completion of assembly, the HEAD PLATE (72) does not
sit on top of the first WEIGHT PLATE (105), push the HEAD
PLATE (72) down, insert the WEIGHT STACK PIN (75) and
perform several repetitions at the press station. This will relax the
cable system and prevent the HEAD PLATE (72) from lifting up.
STEP 45
• If after completing previous step, the HEAD PLATE (72) still does
not sit on top of the first WEIGHT PLATE (105) or if there is
excess slack in the cable system, adjust the two threaded ends of
the HEAD PLATE CABLE (102) accordingly and retighten the jam
nuts.
• If there is excess slack in the AB or PEC DEC cable system, adjust
the threaded end of the AB CABLE (103) accordingly and re-
tighten the jam nut.
38
72
75
105
102
FIGURE 45
STEP 46
•
Apply pressure to the bottom of one SHROUD (31) where thw “V” groove is and carefuly remove the weight stack opening on the plastic
SHROUD (31) as shown in FIGURE 46. This will be the front SHROUD (31).
FIGURE 46
•
Apply one PARABODY 425
SERIOUS STEEL
LABEL (32) to the front SHROUD (31) approximately 2” from the top as shown in FIGURE
46.
32
31
31
2”