9
Grain-Weigh 200A Operating Procedures
1. Check engine oil and fuel before starting engine.
2. Run engine and hydraulic system to pre-warm before loading system.
3. Refer to the Digi-Star Operators Manual for details on the key functions for the Model
EZ2500 Indicator.
4. Digi-Star system will shut down if turned on prior to starting engine.
5. Receive grain.
6. Record weight data for yield comparison if desired.
7. Move auger to “up” position for unloading grain.
8. Turn on auger.
9. Increase engine rpm to 3,000 rpm.
10. Open inside unloading door.
11. Transfer grain to receiving vehicle and record weight data for yield comparison if desired
for seed tendering.
12. Decrease engine rpm to idle throttle.
13. Turn off auger, and close unloading door.
14. Move auger to “down” or “storage” position for transporting.
15. Await next load to receive, weigh, and transfer.
16. Bulk seed handling: Run Briggs and Stratton engine at 1,800 rpm with door half open and
keep seed tube full of grain for minimal seed damage.
17. Always clean out bin and auger after using treated seed.
Summary of Contents for Grain-Weigh GW200A
Page 5: ...5 Grain Weigh 200A Dimensions ...
Page 15: ...15 Grain Weigh 200A Axle Hub Assembly ...
Page 19: ...19 Grain Weigh 200A Frame Body Front View ...
Page 24: ...24 Grain Weigh 200A Electrical Schematic ...
Page 25: ...25 Grain Weigh 200A Electrical Schematic ...
Page 26: ...26 Grain Weigh 200A Electrical Schematic ...
Page 27: ...27 Grain Weigh 200A Electrical Schematic ...
Page 28: ...28 Grain Weigh 200A Hydraulic System ...
Page 29: ...29 Grain Weigh 200A Hydraulic System ...
Page 32: ...32 Grain Weigh 200A Shurco Roll Tarp Replacement Parts ...
Page 34: ...34 Model EZ2500 INDICATOR ...