Before applying power to the unit, ensure that you have an appropriate power supply for
your region. Use the following recommended Panduit power supply for your region
listed in Appendix A or a recommended end use LPS power supply where applicable.
Table 1: Power Supply Part Numbers
Region
Part Number
North America
PVQ-PS12VDC-S
Europe
PVQ-PS12VDC-E
United Kingdom
PVQ-PS12VDC-U
Japan
PVQ-PS12VDC-J
China
PVQ-PS12VDC-C
Universal
PVQ-PS12VDC-UNI
Installing/ Connecting PViQ™ Connectivity System to the
Management Network
Refer to Appendix A: PViQ™ Connectivity Hardware Installation for installing and
connecting the PViQ™ Connectivity System into the network.
Initial Power Up of PViQ™ Connectivity System
When power is first applied to a new PViQ™ Connectivity System, a series of
diagnostics and firmware updates take place. These updates are automatic and occur
without intervention from the user.
From the user point of view, you will see port LEDs lighting and extinguishing in a series
as the PM synchronizes the firmware revisions of each piece of hardware. When all of
the port LEDs are extinguished, and the System Status (SYS) LED on each Interface
Unit (IU) is solid green (will flash amber every 10 seconds indicating the processors in
the intelligent modules are running), the panel is in “Secure” mode and ready for
operation.
NOTE: If any cables are connected to a port, a RED LED may be lit above that port.