background image

INSTRUCTIONS CM336

For Technical Support: www.panduit.com/resources/install_maintain.asp

Step 4: Horizontal Cabling and Patch Panel Installation

4.4

T

AK

-T

APE

Location

4.2

PRBR3

Conduit

Knockout

4.1 Route horizontal cable from work area to the enclosure by way 

of conduit, raceway (TG-70 or T-70), or through the cable brea-
kouts on the back wall of enclosure. Use supplied edge grom-
met to protect cables from sharp metal edges of raceway 
knockouts and cable breakouts. Be sure to allow enough slack 
to route and terminate cable.

4.2 With Patch Panel Bracket in up the position, install patch pan-

els (suggested PANDUIT Part No. CPPL24WBL sold sepa-
rately) along with PRBR3 bend radius posts to the front side of 
the bracket. (See figure 4.2) 

4.3 Rotate Patch Panel Bracket down by twisting latches to release 

bracket. Terminate cables with M

INI

-C

OM

 G

IGA

-TX style jack 

modules (sold separately). Snap modules into patch panels. 
Punchdown Patch Panels can also be used.

4.4 Secure cables to bracket arm and back wall using supplied 

T

AK

-T

YS

 (See figure 4.4).

4.5 Rotate bracket into up position and rotate latches to hold 

bracket in place (See figure 4.5)

.

Latches

4.5

T

AK

-T

APE

Location

5.1 Remove perforated panel
5.2 Identify the number of control systems to be mounted (e.g. access control, 

lighting, HVAC, etc.). 

        Note: Do not exceed 50 watts without a fan or 180 watts with fan.

22.5

31.9

Step 5: Control System Mounting

Page 4 of 6

Reviews: