INSTRUCTIONS CM336
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 6
Step 2: Door and Lock Installation
2.1 Determine from what side the door will hinge. Pay
attention to how close the enclosure is to a corner, a
door, or any other object that may obstruct the opening
of the door.
2.2 Use the carriage bolts,lock washer and nuts to attach
the hinges. Snap the two retaining rings into the groove
on the hinge pin. Insert hinge pins in the base side
hinges. (See figure 2.2)
Note: Slots in door and base allow door to be positioned
relative to base for improved fit. Perform step 2.3 before
tightening hinge nuts.
2.3 Lift door and position perpendicular to the base. Slide
door down into place.
2.4 Determine if the installation requires the door lock hasp
(supplied) or the keyed locks (sold separately).
Door Lock Hasp Installation:
Knockout the two holes on the opposite side of the
hinges in the middle of the enclosure on both the
base and the door (See figure 2.4a). Attach the latch
to the base and the catch to the door using supplied
#10-32 size screws and nuts. Plug 8 existing holes
with supplied hole caps.
Keyed Locks Installation: (sold separately)
Knockout the two large holes directly opposite from
the hinges on the cover. Slide in lock body and then
slide lock guide over the lock body. Attach lock hook
with supplied screw.(See figure 2.4b). Plug 8 existing
holes with supplied hole caps.
2.2
Retaining Ring
2.4a
2.4b
Hole Cap
Lock Guide
Step 3: Grounding
3.1 P
ANDUIT
recommends the use of S
TRUCTURED
G
ROUND
Enclosure Grounding kit (PZAEGK) for grounding the
P
AN
Z
ONE
Building Automaton Systems Enclosure
3.2 Attach grounding bracket as shown in figure 3.2.
3.3 Attach main building ground to bracket.
3.4 Attach two solid grounding cables to ground bracket as
shown in figure 3.2
3.2