background image

INSTRUCTIONS CM336

For Technical Support: www.panduit.com/resources/install_maintain.asp

Page 3 of 6

Step 2: Door and Lock Installation

2.1 Determine from what side the door will hinge. Pay 

attention to how close the enclosure is to a corner, a 
door, or any other object that may obstruct the opening 
of the door.

2.2 Use the carriage bolts,lock washer and nuts to attach 

the hinges. Snap the two retaining rings into the groove 
on the hinge pin. Insert hinge pins in the base side 
hinges. (See figure 2.2)

Note: Slots in door and base allow door to be positioned 

relative to base for improved fit. Perform step 2.3 before 
tightening hinge nuts. 

2.3 Lift door and position perpendicular to the base. Slide 

door down into place.

2.4 Determine if the installation requires the door lock hasp 

(supplied) or the keyed locks (sold separately).

Door Lock Hasp Installation:

Knockout the two holes on the opposite side of the 
hinges in the middle of the enclosure on both the 
base and the door (See figure 2.4a). Attach the latch 
to the base and the catch to the door using supplied 
#10-32 size screws and nuts. Plug 8 existing holes 
with supplied hole caps.

Keyed Locks Installation: (sold separately)

Knockout the two large holes directly opposite from 
the hinges on the cover. Slide in lock body and then 
slide lock guide over the lock body. Attach lock hook 
with supplied screw.(See figure 2.4b). Plug 8 existing 
holes with supplied hole caps.

2.2

Retaining Ring

2.4a

2.4b

Hole Cap

Lock Guide

Step 3: Grounding

3.1 P

ANDUIT

 recommends the use of S

TRUCTURED

G

ROUND

 

Enclosure Grounding kit (PZAEGK) for grounding the 
P

AN

Z

ONE

 Building Automaton Systems Enclosure

3.2 Attach grounding bracket as shown in figure 3.2.

3.3 Attach main building ground to bracket.

3.4 Attach two solid grounding cables to ground bracket as 

shown in figure 3.2

3.2

Reviews: