background image

E-mail:

[email protected]

Fax:

  

(708) 444-6448

For Instructions in Local Languages

and Technical Support:

www.panduit.com/resources/install_maintain.asp

INSTALLATION INSTRUCTIONS

 © Panduit Corp. 2010

FS012

www.panduit.com

Re-install front and rear door assemblies if 
removed during fiber installation.

Attach Laser Warning Label and Caution Label 
where they are clearly visible.

Figure 9

Rotate the Bend Radius Posts to the open 
position on each end of the patch field to allow 
room to route patch cords under the tabs to the 
cable manager.

Plug fiber connector into FAP adapter. Route 
patch cords down to fiber manager base, under 
fiber manager fingers and Bend Radius Posts to 
cable manager. 

After all patch cords have been routed to the cable 
manager, rotate Bend Radius Posts back to the 
closed position to contain the patch cords within 
the fiber manager. Tighten the connection of the 
Bend Radius Posts to the enclosure by securing 
the hex nut at the rear of the fiber manager and 
tightening the Bend Radius bolt with a Phillips 
head screwdriver.

Page 10 of 10

Figure 10A

Figure 10

Bend Radius Posts 
in open position

Summary of Contents for FCE4U

Page 1: ...NG UNMATED CONNECTORS MAY EMIT INVISIBLE LASER RADIATION DO NOT LOOK DIRECTLY INTO THE END OF THE CONNECTOR DO NOT INSPECT WITH MAGNIFYING DEVICES MAINTAIN CAP ON UNMATED CONNECTORS Care should be tak...

Page 2: ...surrounding sheet metal DO NOT install grommet at this stage grommet will be installed after enclosure is mounted to rack Place enclosure mounting brackets at desired position on the rack Mount the en...

Page 3: ...re Install grommet following the proper cutting diagram See Figure 4A Cut the small circle for 1 diameter innerduct Cut the large circle for 1 1 2 diameter innerduct Cut the straight lines when not us...

Page 4: ...lted down cables omitted for clarity Opticom QuickNet Cassette Installation Route fiber through grommet to fiber cassettes as shown Leave enough slack so when the drawer is fully extended the cables a...

Page 5: ...For Technical Support www panduit com resources install_maintain asp INSTALLATION INSTRUCTIONS Panduit Corp 2010 FS012 Figure 6C Tray in home position cover omitted for clarity Page 5 of 10...

Page 6: ...punch hole into adhesive mounts Note spool orientation Position FAPs between upright flanges as shown Once mounted fully seat NyLatches to secure FAPs Fully extend tray to ensure proper amount of slac...

Page 7: ...tended the cables are not put under tension DO NOT use so much slack that the drawer cannot be returned to its home position See Figure 7C Use Tak Tys to secure fiber cords at cable entry location and...

Page 8: ...der note orientation The remaining FOSMs are stacked on top of each other and snap in place after termination of lower tray Position FAPs between upright flanges as shown Once mounted fully seat NyLat...

Page 9: ...lete loop of individual fibers around splice tray slack spools See instruction sheet for splice trays Leave enough jacketed slack so when the drawer is fully extended the cables are not put under tens...

Page 10: ...eld to allow room to route patch cords under the tabs to the cable manager Plug fiber connector into FAP adapter Route patch cords down to fiber manager base under fiber manager fingers and Bend Radiu...

Reviews: