
INOXPAN S.L.
EN
Firstly, we would like to thank you for your confidence in our firm when you chose a Pando extractor
hood.
Read carefully the safety instructions
indicated in the use and installation manual enclosed in the
accessories and product documentation bag.
Installation should only be carried out by qualified professionals, professional installers or
the official technical service.
VERY IMPORTANT!
When opening the packaging, check that all the components are in perfect state and all the
accessories are present. If this is not the case, contact the dealer and do not install.
Once installed,
any damage to the exterior such as scratches, dents, stains, etc. will not be covered by the
guarantee.
DO NOT REMOVE THE PROTECTIVE PLASTIC FROM THE HOOD UNTIL IT IS COMPLETELY
INSTALLED, IF THIS PLASTIC IS NOT PRESENT IN AREAS THAT COULD HAVE A RISK OF
DAMAGE DURING INSTALLATION, IT IS RECOMMENDED TO APPLY PROTECTIVE
MATERIALS AGAINST IMPACT, SCRATCHES AND CONTACT WITH CORROSIVE AGENTS.
TAKE ESPECIAL CARE DURING THE INSTALLATION IF OTHER WORK IS ALSO IN
PROGRESS, BECAUSE PAINT, SILICON, PLASTER AND OTHER MATERIALS COULD
CONTAIN CORROSIVE CHEMICALS THAT MAY DAMAGE THE PRODUCT, IN THESE CASES
IT IS RECOMMENDED TO ADEQUATELY PROTECT THE HOOD, BY FOR EXAMPLE,
HERMETICALLY COVERING AREAS THAT COULD BE AFFECTED WITH PLASTIC.
THIS WILL AVOID DAMAGE TO THE OUTSIDE OF THE APPLIANCE, SOMETHING THAT WILL
NOT BE COVERED BY THE GUARANTEE.
It must be taken into account and provide that the hood and peripherals must have easy and safe
access for possible maintenance or repair tasks of the official Pando technical service (SAT).
The guarantee will NOT
cover the costs and means necessary for access to a product that does
not meet these conditions. In the event that the product is not easily accessible or safe, a
criterion that will be issued by SAT in its initial inspection, it will be the responsibility of the client
to place the means and assume the necessary costs so that the SAT can perform the intervention
adequately.
EN - INTRODUCTION
EN - SAFETY INSTRUCTIONS
14
Summary of Contents for P-960
Page 3: ...ES ...
Page 4: ...PT ...
Page 5: ...FR ...
Page 6: ...EN ...
Page 15: ...CONTENIDO CONTEÚDO CONTENU CONTENT x6 x6 x1 Plantilla Ø 6x50 7 15 ...
Page 17: ...1 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 9 17 ...
Page 18: ...INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 300 15 350 940 425 650 190 x6 x6 2 10 18 ...
Page 19: ...3 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 5mm X2 940 11 19 ...
Page 20: ...4 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 1º 2º 12 20 ...
Page 21: ...5 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION X2 13 21 ...
Page 22: ...6 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION X2 14 22 ...
Page 23: ...7 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 10 15 23 ...
Page 24: ...8 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 9 16 24 ...
Page 27: ...INOXPAN S L NOTAS NOTAS REMARQUES NOTES 19 27 ...
Page 28: ...INOXPAN S L NOTAS NOTAS REMARQUES NOTES 20 28 ...
Page 29: ...INOXPAN S L NOTAS NOTAS REMARQUES NOTES 21 29 ...
Page 30: ...INOXPAN S L NOTAS NOTAS REMARQUES NOTES 22 30 ...
Page 31: ...INOXPAN S L 23 31 ...