Table of Contents
1. About safety ......................................1
1.1 Safety precautions ....................................1
1.2 Safety instructions that must be observe 1
2. Rated Specifications ........................ 4
2.1 Rated specifications for 350GL4 ............4
2.1.1 Duty cycle ...................................................5
2.1.2 Dimensions...................................................5
2.2 Rated specifications for 500GL4... ............6
2.2.1 Duty cycle ...................................................6
2.2.2 Dimensions...................................................6
3. Installation .........................................7
3.1 Transportation ..........................................7
3.2 Installation site ..........................................7
3.3 Power supply equipment .........................7
4. Configuration ....................................8
4.1 what’s needed ..........................................8
4.2 Connecting cable ....................................9
4.2.1 About connecting cable ............................9
4.2.2 Cautions about using connecting cable.....9
5. Names and functions .....................10
5.1 Switches and rear side ...........................10
5.2 Front panel .............................................12
6. Connection ......................................16
6.1 Output side connection .........................16
6.1.1 Connecting cable from base metal ...........16
6.1.2 Connecting torch cable ............................17
6.1.3 Connecting feeder cable ..........................17
6.1.4 Connecting grounding wire .......................18
6.1.5 Connecting input powe r cable ..................18
6.2 Connecting jig(s) ....................................19
6.2.1 Layout of jig terminals ..............................19
6.2.2 Functions of jig terminals ..........................19
7. Preparation and termination
processings........................................20
7.1 Preparation ..............................................20
7.1.1 Use of protective equipment .....................20
7.1.2 Pre-operation check .................................20
7.1.3 Turning on power .....................................20
7.2 Termination processing (steps after
welding operation) ...................................20
7.2.1 Shutting off gas ........................................20
7.2.2 Shutting off power ....................................20
8. Settings ...........................................21
8.1 FUNCTION settings ..............................21
8.1.1 “F. ADJ” .................................................21
8.1.2 “CALL” and “RECORD” .........................25
8.2 CHANGE settings ...............................26
8.4 Welding wire inching .............................27
8.5 Checking shield gas ..............................27
9. Operation ........................................28
9.1 Welding current calibration .................28
9.2 “NO CRATER”.........................................28
9.3 “CRATER” .............................................29
9.4 “INI. &CRATER”......................................30
9.5 “Crater repeat” operation ....................31
9.6 “ARC SPOT” ..........................................32
10. Maintenance and inspection..........33
10.1 Daily check ..........................................33
10.1.1 Welding machine (This product) ..........33
10.1.2 Cables .................................................33
10.1.3 Other devices ......................................34
10.2 Periodic check ....................................35
10.2.1 Check guideline ................................... 35
10.3 Precautions for withstand voltage test and
insulation resistance measurement ......36
10.3.1 Test preparation .................................. 36
10.3.2 After completion of the test ....................36
11. Troubleshooting ............................37
11.1 Error indication ...................................37
11.2 Troubleshooting table ..........................39
12. Parts list .........................................39
12.1 Parts list for 350GL4.............................40
12.2 Parts list for 500GL4.............................40
13. Circuit diagram ..............................48
13.1 Circuit diagram for 350GL4 ................48
13.2 Circuit diagram for 500GL4.................49
14. Appendix ........................................50
14.1 CO2 welding conditions table: Solid wire
(Reference) .............................................50
14.2 MAG welding conditions table: Solid wire
(Reference) .............................................52
14.3 Arc spot welding conditions table
(Reference) .............................................52
14.4 Welding conditions memorandum.....54
14.4 Welding conditions memorandum.....53
8.3 The welding machine factory defaults
reset
.............................................26
Summary of Contents for YD-350GL4
Page 45: ...41 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 40 41 43 44 45 Right view Left view Parts list ...
Page 49: ...45 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 40 41 43 44 45 Right view Left view Parts list ...
Page 53: ...Circuit diagram 49 13 1 Circuit diagram for 500GL4 100V 100V Optional parts 300 248 ...