6.2 The connection of the grounding wire
Water supply pipes, building iron frames, etc. do not serve as sufficient
ground. Do not connect any grounding wire to them.
1
Ground terminal
M8 bolt
2
Grounding wire
10 mm
2
or more.
Customer preparation
3
Ground
-
* Grounding work should be performed by qualified elec-
tricians.
6.3 The connection of input cable
• Install one distribution box each for this product.
• Make sure to turn off the power distribution box first.
(1) Cut off the switch in the distribution box.
(2) Remove input terminal cover.
(3) Please connect the other side of the input power source cable
to the input terminal of the power source, input cable (U, V, W wire)
please be sure to use wire clipping board to fix them.
Note:
·Please insert the serrated spacer between the ground connection
terminal and grounding wire.
·After connecting input terminal block, use the clamping board to
fasten the input cables, avoiding loose connection or dropping off.
(4) Install the input terminal cover.
“Recommended crimping terminal”
Note:
Do not use wrench
Tightening torque:2.45
Nm
- 3.40
Nm
Note:
For safety, please be sure to restore the input terminal cover and fasten the bolts after connecting all kinds of
cables.
When connecting input cables and grounding wire, please avoid the any wrong connections between grounding
wire and input terminal, between input cable and ground connection terminal.
●
1
Distribution box
Customer preparation
2
Input power cable
Customer preparation
3
Input terminal board
-
4
Terminal cover
-
16.5mm below
Summary of Contents for YD-350FD2
Page 9: ...Rated Specifications 6 2 4 Dimensions 机型 W H L YD 350FD2HGY 570 1060 1200 YD 500FD2HGY ...
Page 30: ...Operation 27 9 2 CRATER Operation Turn the torch switch on and off twice ...
Page 45: ...Circuit diagram 42 13Circuit diagram 13 1 Circuit diagram for YD 350FD2HGY ...
Page 46: ...Circuit diagram 43 13 2 Circuit diagram for YD 500FD2HGY ...