25
3-3. Routing the Tubing
●
The tubing can be routed out either from the front or from the bottom.
●
The connecting valve is contained inside the unit. Therefore, remove the front panel.
(1) If the tubing is routed out from the front, use cutting pliers or a similar tool to cut out the tubing outlet slit (part indicated by
)
from the tubing cover.
39-3/8 (1000)
A
45/64 (18)
B
C
45-9/32 (1150)
46-29/64 (1180)
19/32 (15)
Unit: in. (mm)
Air intake
(Installation hole pitch)
Air intak
e
Air intak
e
A : 37-61/64 (964) [Installation hole pitch] * The tubing is routed out from the front.
B : 28-47/64 (730) [Installation hole pitch] * The tubing is routed out from the bottom.
C : 28-47/64 (730) [Installation hole pitch]
Tubing cover
Tubing cover
Slit part
Slit hole
Indentation (5 locations)
Front
Remove 10 panel screws
from front panel
Bottom
ex.) type 72/96/120/144 (208 / 230 V model)
(2) If the tubing is routed out from the bottom, remove the slit part (
).
●
Use a drill bit approximately 13/64" (5.2 mm) dia. to create holes at the
5 slit hole indentations (openings).
●
Punch out the slit part (
).
●
Be careful not to damage the base plate.
Tubing cover
Remove 4 screws
Use cutting pliers or similar
tool to cut out cover.
01_302412_Eng.indd 25
2018/7/4 13:30:46