
26
3-5. Prepare the Tubing
●
Material: Use C1220 phosphorous deoxidized copper as described in JIS H3300, “Copper and Copper Alloy
Seamless Pipes and Tubes.”
(For tubes that are ø1" (ø25.4 mm) or larger, use 1/2H material or H material. For all others use O material.)
●
Tubing size
Use the tubing size indicated in the table below.
●
When cutting the tubing, use a tube cutter, and be sure to remove any burrs.
(The same applies to distribution tubing (optional).)
●
When bending the tubes, bend each tube using a radius that is at least 4 times the outer diameter of the tube.
When bending, use sufficient care to avoid crushing or damaging the tube.
●
For flaring, use a flare tool, and be sure that flaring is performed correctly.
CAUTION
Use sufficient caution during preparation of the tubing. Seal the tube ends by
means of caps or taping to prevent dust, moisture, or other foreign substances
from entering the tubes.
Refrigerant tubing (Existing tubing can be used.)
Tubing size (mm)
Outer dia.
Thickness
Outer dia.
Thickness
ø1/4" (ø6.35)
t1/32" (t0.8)
ø3/4" (ø19.05)
over t5/128" (t1.0)
ø3/8" (ø9.52)
t1/32" (t0.8)
ø7/8" (ø22.22)
t5/128" (t1.0)
ø1/2" (ø12.7)
t1/32" (t0.8)
ø1-1/8" (ø28.58)
t5/128" (t1.0)
ø5/8" (ø15.88)
t5/128" (t1.0)
ø1-3/8" (ø34.92)
over t3/64" (t1.1)
3-6. Connect the Tubing
●
Use the supplied connector tubing. (See figure below.)
1
2
3
4
72 type (6-Ton)
9
6 type (8-Ton)
1
2
3
4
Refrigerant tube port
●
Use caulking, putty, or a similar material to fill any
gaps at the refrigerant tube port (
) in order to
prevent rainwater, dust or foreign substances from
entering the unit.
* Perform this work even if the tubing is routed out
in a downward direction.
Tubing
cover
Base plate
Tubing routed out forward
Tubing routed out downward
Refrigerant
tubing
Connection method
Use supplied
connector tube?
1
Suction tube
Brazed connection
No
2
Discharge tube
Brazed connection
No
3
Liquid tube
Brazed connection
No
4
Balance tube
Flared connection
No
Refrigerant
tubing
Connection method
Use supplied
connector tube?
1
Suction tube
Brazed connection
Yes (ø3/4"
→
ø7/8")
2
Discharge tube
Brazed connection
Yes (ø5/8"
→
ø3/4")
3
Liquid tube
Brazed connection
No
4
Balance tube
Flared connection
No
W-3WAY̲ECO-i̲U.indb 26
W-3WAY̲ECO-i̲U.indb 26
2011/11/07 16:29:36
2011/11/07 16:29:36
Summary of Contents for U-72MF1U9
Page 53: ...53 W 3WAY ECO i U indb 53 W 3WAY ECO i U indb 53 2011 11 07 16 29 45 2011 11 07 16 29 45...
Page 54: ...54 W 3WAY ECO i U indb 54 W 3WAY ECO i U indb 54 2011 11 07 16 29 45 2011 11 07 16 29 45...
Page 55: ...55 W 3WAY ECO i U indb 55 W 3WAY ECO i U indb 55 2011 11 07 16 29 45 2011 11 07 16 29 45...