21
7.11. Remove the SC-Board
1. Remove the SU-Board and SD-Board. (See section 7.9.
and 7.10.)
2. Unlock the cable clampers to free the cable.
3. Disconnect the connector (SC2).
4. Disconnect the flexible cable (SC20).
5. Remove the screws (
×
6
) and remove the SC-Board.
7.12. Remove the SS2-Board
1. Remove the Tuner unit. (See section 7.4.)
2. Disconnect the bridge connector (SS21-SS24) and dis-
connect the flexible cable (SS58).
3. Remove the screws (
×
2
) and remove the SS2-Board.
7.13. Remove the SS-Board
1. Remove the Tuner unit. (See section 7.4.)
2. Unlock the cable clampers to free the cable.
3. Disconnect the connectors (SS11 and SS33).
4. Disconnect the flexible cables (SS61 and SS64).
5. Disconnect the bridge connector (SS21-SS24).
6. Remove the screws (
×
6
) and remove the SS-Board.
7.14. Remove the Hanger metals and
the Stand brackets
1. Remove the Plasma panel section from the servicing
stand and lay on a flat surface such as a table (covered
by a soft cloth) with the Plasma panel surface facing
downward.
2. Remove the Hanger metals (L, R) fastening screws (
×
4
each) and remove the Hanger metals (L, R).
3. Remove the Stand brackets (L, R) fastening screws (
×
4
each) and remove the Stand bracket metals (L, R)
and the Stand brackets (L, R).
Summary of Contents for TH-P42S10A
Page 16: ...16 6 4 No Picture ...
Page 27: ...27 8 1 4 Adjustment Volume Location 8 1 5 Test Point Location ...
Page 32: ...32 ...
Page 38: ...38 ...
Page 40: ...40 10 3 Wiring 2 ...
Page 41: ...41 10 4 Wiring 3 ...
Page 42: ...42 ...
Page 43: ...43 11 Schematic Diagram 11 1 Schematic Diagram Note ...
Page 79: ...79 A B C D E F G H I 1 2 3 4 5 6 P BOARD COMPONENT SIDE ETX2MM747MFE ...
Page 90: ...90 ...
Page 92: ...92 13 1 2 Packing 1 ...
Page 93: ...93 13 1 3 Packing 2 ...
Page 97: ...97 13 2 Electrical Replacement Parts List 13 2 1 Replacement Parts List Notes ...