![Panasonic TH-85PF12UK Installation Manual Download Page 3](http://html1.mh-extra.com/html/panasonic/th-85pf12uk/th-85pf12uk_installation-manual_4232638003.webp)
z
Install the PDP in accordance with applicable laws and regulations of the
destination country/region.
z
The installation work must be carried out only by professionals.
z
The power supply for this PDP must meet the requirements of the destination
country. The rated power consumption is TBD.
It is recommended that the PDP use a dedicated power line.
z
Provide adequate ventilation in the installation location so that the ambient
temperature will not exceed 40
°
C.
Make a clearance of 100 mm or more above and on both sides of the PDP and a
clearance of 150 mm or more behind the PDP.
z
The length of the power cord supplied with the PDP is 3 m.
z
Position of the center of gravity (Reference)
Horizontal and vertical center of gravity: The center of the set
Depth from the front to the center of gravity of the set
PDP alone: 33 mm
With the wall mount bracket: 51 mm
z
Eye bolt type
The size of the eye bolts on the PDP (two on the left and right sides and three on
the top) is M12-20 mm.
Summary of Contents for TH-85PF12UK
Page 1: ......
Page 13: ...100 D 150 100 100 100 E C B A Unit mm A D C E B ...
Page 14: ...E D C B A 150 100 100 100 100 Unit mm A B C D E ...
Page 18: ...Base Plate 30 16 Unit mm ...
Page 19: ...z Stand specifications Model No TY CE85PS12 Weight Approx 32 0 kg ...
Page 22: ... Drawings and Earthquake Resistance Data Reference ...