
Installation and Settings
WUME-SCHG1C-4
3-2
3-1 Steps prior to operation
The steps that are required prior to operation are indicated below.
Check column
Page
Mode settings
Follow the setting procedures to set the product's
communication method and number of occupied sta-
tions.
Controller settings
Configure controller settings.
Configure threshold and other settings by program
-
ming or direct setting on the controller.
For direct setting on a controller, refer to the manual
for the controller.
Unit mounting
Mount the product and controllers on a DIN rail ac-
cording to the system configuration, and connect.
Station number and communication speed settings
Follow the setting procedures to set the product's
station number and communication speed.
“3-2-1 CC-Link communication set-
“4-10-1 HG-S series command list”
Programming
Create a program for control of each controller con-
nected to the product from the master station.
*1: You can use CSP+ (CC-Link System Profile) to
easily configure CC-Link communication settings.
Connect power supply
Connect the power supply of the master controller.
“3-3-4 Host communication cable
“3-3-5 Procedure for connecting the
“3-3-6 Attachment and removal of
Wiring
Connect the communication cable and a termination
resistor (if needed) to the CC-Link connector, and at-
tach to the product.
Summary of Contents for SC-HG1-C
Page 2: ...WUME SCHG1C 4 2 MEMO ...
Page 8: ...WUME SCHG1C 4 8 MEMO ...
Page 16: ...WUME SCHG1C 4 1 8 MEMO ...
Page 17: ...2 1 2 System Configuration 2 1 Communication unit system 2 2 2 2 Unit types 2 4 ...
Page 22: ...WUME SCHG1C 4 2 6 MEMO ...
Page 106: ...WUME SCHG1C 4 4 72 MEMO ...
Page 107: ...5 1 5 Specifications 5 1 Specifications 5 2 5 2 Dimensions 5 3 ...
Page 110: ...WUME SCHG1C 4 5 4 MEMO ...
Page 111: ...6 1 6 Warranty 6 1 When you purchase and use the product 6 2 ...
Page 114: ...WUME SCHG1C 4 6 4 MEMO ...
Page 124: ...WUME SCHG1C 4 8 8 MEMO ...
Page 126: ... MEMO ...
Page 127: ... MEMO ...