66
Step 9 Put aside Main P.C.B..
Step 10 Attach with 22P extension FFC (Part No.
RFKZBT200E2) from CN503 to CN8501.
Step 11 Upset Main P.C.B..
Step 12 Attach with 28P extension FFC (Part No.
RFKZBT200E1) from CN506 to P58008.
Step 13 Process to check and service Side B of Main P.C.B..
Caution: Insulated material is required to insulate Main
P.C.B from other parts.
10.2. Checking & Servicing of SMPS
P.C.B.
Step 1 Release the tabs at the bottom of the front panel assem-
bly.
Step 2 Remove top cabinet.
Step 3 Detach 7P FFC at the connector (CN506) on Main
P.C.B..
Step 4 Detach 20P FFC at the connector (CN806) on Main
P.C.B..
Step 5 Release the tabs at each side at the front panel assem-
bly in the direction of arrow.
Summary of Contents for SA-BT300PX
Page 15: ...15 5 3 Using BD LIVE or BONUSVIEW in BD Video ...
Page 18: ...18 5 5 Speaker Connections ...
Page 21: ...21 5 7 About MP3 JPEG files ...
Page 38: ...38 9 2 Main Components and P C B Locations ...
Page 63: ...63 9 28 6 Grease ...
Page 64: ...64 9 28 7 How to Clean the Lens of Optical Pick UP Follow the 9 2 1 Upper Base Ass y ...
Page 82: ...82 ...
Page 88: ...88 ...
Page 90: ...90 ...
Page 118: ...118 ...
Page 120: ...120 ...
Page 124: ...124 19 1 3 BD Mechanism Cabinet ...