68
Step 9 Put aside Main P.C.B..
Step 10 Attach with 22P extension FFC (Part No.
RFKZBT200E2) from CN503 to CN8501.
Step 11 Upset Main P.C.B..
Step 12 Attach with 28P extension FFC (Part No.
RFKZBT200E1) from CN506 to P58008.
Step 13 Process to check and service Side B of Main P.C.B..
Caution: Insulated material is required to insulate Main
P.C.B from other parts.
10.2. Checking & Servicing of SMPS
P.C.B.
Step 1 Release the tabs at the bottom of the front panel assem-
bly.
Step 2 Remove top cabinet.
Step 3 Detach 7P FFC at the connector (CN506) on Main
P.C.B..
Step 4 Detach 20P FFC at the connector (CN806) on Main
P.C.B..
Step 5 Release the tabs at each side at the front panel assem-
bly in the direction of arrow.
Summary of Contents for SA-BT205GA
Page 13: ...13 Refer to their respective original service manuals for 1 ...
Page 40: ...40 9 2 Main Components and P C B Locations ...
Page 65: ...65 9 28 6 Grease ...
Page 66: ...66 9 28 7 How to Clean the Lens of Optical Pick UP Follow the 9 2 1 Upper Base Ass y ...
Page 84: ...84 ...
Page 90: ...90 ...
Page 92: ...92 ...
Page 120: ...120 ...
Page 122: ...122 ...
Page 126: ...126 ...
Page 127: ...127 19 1 3 BD Mechanism Cabinet ...