11 Checking for major P.C.Bs
Note:
Checking of all major P.C.Bs (Main P.C.B., Panel P.C.B., Transformer P.C.B., Deck P.C.B., Deck Mechanism P.C.B., Sub-
Power P.C.B. and Power P.C.B.) can be carried out using below procedures.
For the disassembling procedures, refer to Section 10.
11.1. Checking of Main P.C.B.
1. Remove Top Cabinet and Rear Panel.
2. Remove CD Lid.
3. Disassemble CD Mechanism Unit.
4. Connect FFC wires (CN2801 & CN2805) from CD Mechanism Unit.
40
SA-AK631GCP
Summary of Contents for SA-AK631GCP
Page 8: ...8 Accessories Remote Control FM Antenna AC Cord AM Loop Antenna AC Plug Adaptor 8 SA AK631GCP ...
Page 9: ...9 Operation Procedures 9 SA AK631GCP ...
Page 10: ...10 SA AK631GCP ...
Page 59: ...16 Voltage Measurement 59 SA AK631GCP ...
Page 60: ...60 SA AK631GCP ...
Page 92: ...22 Troubleshooting Guide 92 SA AK631GCP ...
Page 94: ...23 1 Deck Mechanism RAA3412 S 23 1 1 Deck Mechanism Parts Location 94 SA AK631GCP ...
Page 95: ...95 SA AK631GCP ...
Page 98: ...98 SA AK631GCP ...
Page 100: ...23 3 Cabinet 23 3 1 Cabinet Parts Location 100 SA AK631GCP ...
Page 101: ...101 SA AK631GCP ...
Page 112: ...23 6 Packaging 112 SA AK631GCP PRT0503 S J N A E ...