C.B.A.
A. Make sure the Mode Select SW. on the Main C.B.A. is in EJECT
position. If not, rotate the Mode Select SW. until the alignment
projection is in the EJECT Position.
B. Make sure the Mechanism and Cassette Up Ass’y are in the EJECT
Position. (Refer to "
EJECT Position Confirmation
" in DISASSEMBLY/
ASSEMBLY PROCEDURES.)
Fig. D4
C. Install the Mechanism Chassis and Cassette Up Ass’y straight onto
the Main C.B.A. so that the Sensor LED clears the hole in the
Mechanism Chassis and that 2 Connectors (P4001, P6201) are
aligned and seated securely.
D. Connect the Flat Flexible Cables from P3501, P4002 and P6202 on
the Main C.B.A. by soldering at below 320°C for less than 3 seconds
as shown.
Install the Shield Plate as shown.
Fig. D5-1
29
Summary of Contents for Quasar Omnivision PV-V4021-K
Page 9: ...2 Fault indication will be displayed in F I P as shown Fig 2 2 FIg 2 3 9 ...
Page 13: ...5 1 4 1 3 Service Position 2 2 Model M N Fig 4 2 2 13 ...
Page 27: ...Fig D2 6 1 2 1 Notes in chart 27 ...
Page 30: ...Fig D5 2 30 ...
Page 32: ...32 ...
Page 33: ...6 2 2 Inner Parts Location Fig J1 1 33 ...
Page 34: ...34 ...
Page 36: ...Fig J2 1 2 36 ...
Page 67: ...11 2 MECHANISM BOTTOM SECTION 67 ...
Page 68: ...11 3 CASSETTE UP COMPARTMENT SECTION 68 ...
Page 70: ... Model PV V4511 PV V4521 PV V4521 K VHQ 451 70 ...
Page 71: ... Model PV V4611 71 ...
Page 73: ... Model PV V4611 73 ...
Page 78: ...12 2 MECHANICAL REPLACEMENT PARTS LIST MECHANICAL REPLACEMENT PARTS 78 ...
Page 81: ... 81 ...
Page 88: ... 88 ...
Page 90: ...90 ...
Page 95: ...95 ...
Page 105: ...105 ...
Page 109: ...109 ...
Page 145: ...1 2 Schematic Diagram Circuit Board Layout 2 ...