B. Install the Mechanism Chassis and Cassette Up Ass’y straight
onto the TV/VCR Main C.B.A. so that the Sensor LED clears the
hole in the Mechanism Chassis and that 3 Connectors (P6201,
P3001 and P4001) are aligned and seatedsecurely.
5. Installation of Cassette Up Ass’y
A. Confirm that the Locking Tab under the Cassette Up Ass'y is in
Hole on the Mechanism Chassis when installing the Cassette Up
Ass'y. Then, slide the Cassette Up Ass'y towards the back.
B. When installing 2 Screws (449), slide the Holder Unit (Refer to "
WHEN LOADING WITHOUT A CASSETTE
" in Service Notes) to
tighten screws. Then, slide it back to the EJECT Position.
C. Hook Spring to the Drive Rack Arm on the Mechanism Chassis.
6.2. MECHANISM SECTION
6.2.1. Disassembly/Reassembly Method
27
Summary of Contents for PVQ-1312W
Page 22: ...6 1 2 Disassembly Method Fig D2 22 ...
Page 23: ...Fig D3 23 ...
Page 24: ...6 1 2 1 Notes in chart 1 Removal of VCR Unit Fig D4 24 ...
Page 28: ...6 2 2 Inner Parts Location Fig J1 1 28 ...
Page 29: ...6 2 3 EJECT Position Confirmation Fig J1 2 29 ...
Page 30: ...6 2 4 Full Erase Head and Cylinder Unit Fig J2 30 ...
Page 70: ...70 ...
Page 73: ...11 2 MECHANISM BOTTOM SECTION 73 ...
Page 74: ...11 3 CASSETTE UP COMPARTMENT SECTION 74 ...
Page 75: ...11 4 CHASSIS FRAME SECTION 1 75 ...
Page 76: ...11 5 CHASSIS FRAME SECTION 2 76 ...
Page 77: ...11 6 PACKING PARTS AND ACCESSORIES SECTION 77 ...
Page 84: ...121 LSPG1279 PACKING CASE PAPER F 6 84 ...
Page 97: ...R5317 ERDS2TJ101 CARBON 1 4W 100 97 ...
Page 99: ...R6045 ERJ6GEYJ102V MGF CHIP 1 10W 1K 99 ...
Page 118: ...R5401 ERJ6GEYJ561V MGF CHIP 1 10W 560 118 ...