Top Cover and Front Panel Ass'y.
2. Remove a Cut Washer (C-1) on the Pressure Roller Arm Unit as in
Fig. J3
, Page
2-16.
3. Remove the Spring of the Pressure Roller Arm Unit as in
Fig. J3
.
4. Turn the Pressure Roller Arm counterclockwise and lift it up to release from the
Pressure Roller bracket and shaft.
5. Remove the tape from the tape path and posts.
6. Rewind the tape into the cassette by turning the Capstan Pulley counterclockwise
as in
Fig. 7-3
.
7. Remove the Cassette Up Ass'y by removing 2 Screws (S-7), 2 Screws (S-8), 2
Screws (S-14) and 2 Screws (S-15) as in
Fig. D7
and
Fig. D9
, Page 2-3.
8. Remove the cassette from the Cassette Up Ass'y.
9. Adjust the Mechanical Position into the Eject position by rotating the Loading
Pulley.
10. Remove the Pressure Roller Bracket from shaft and reinstall the Pressure Roller
Arm and spring to the bracket as in
Fig. J3
.
11. Reinstall the Pressure Roller Arm Unit and Cut Washer in original position as in
Fig. J3
.
12. Reinstall the Cassette Up Ass'y into the Mechanism Chassis.
3.3. OTHER SERVICE NOTES AND CAUTIONS
3.3.1. OTHER SERVICE NOTES AND CAUTIONS
Align the Sensor LED with the hole in the Mechanism Chassis by gently pushing the
Sensor LED backward with your hand. Refer to
Fig. 8
.
23
Summary of Contents for Omnivision PV-4651
Page 14: ...Fig 2 3 14 ...
Page 27: ...Fig 11 1 1 27 ...
Page 40: ...Fig D1 40 ...
Page 42: ...Fig D2 42 ...
Page 43: ...Fig D3 43 ...
Page 44: ...Fig D4 44 ...
Page 45: ...Fig D5 45 ...
Page 46: ...Fig D7 46 ...
Page 47: ...Fig D8 47 ...
Page 51: ...Fig M2 1 Fig M2 2 51 ...
Page 53: ...Fig M4 1 53 ...
Page 77: ...Fig M19 77 ...
Page 84: ...Fig J5 84 ...
Page 85: ...Fig J6 85 ...
Page 87: ...Fig J9 87 ...
Page 88: ...Fig J10 88 ...
Page 89: ...Fig J11 89 ...
Page 90: ...Fig J12 90 ...
Page 91: ...Fig J13 91 ...
Page 92: ...Fig J15 92 ...
Page 93: ...93 ...
Page 96: ...96 ...
Page 102: ...with the holes on the Pinch Lift Cam as shown in Fig A6 102 ...
Page 103: ...103 ...
Page 105: ...Fig K1 105 ...
Page 106: ...Fig K2 106 ...
Page 107: ...Fig K3 107 ...
Page 109: ...Fig B1 109 ...
Page 114: ...Fig E1 4 3 2 HOW TO READ THE ADJUSTMENT PROCEDURES 114 ...
Page 115: ...Fig E2 115 ...
Page 134: ...R6004 ERJ6GEYJ333V MGF CHIP 1 10W 33K 134 ...
Page 136: ...R6085 ERJ6GEYJ223V MGF CHIP 1 10W 22K 136 ...
Page 140: ...C4601 ECEA1CKA100 ELECTROLYTIC 16V 10 140 ...
Page 147: ...R6065 ERJ6GEYJ223V MGF CHIP 1 10W 22K 147 ...
Page 167: ...9 11 Operation Block Diagrams 1 167 ...
Page 178: ......
Page 204: ......
Page 205: ......