3.2. MECHANICAL ADJUSTMENT PROCEDURES
Refer to the Service Manual for Z-Mechanism Chassis. / (Order No. VRD9802005C2)
3.3. ELECTRICAL ADJUSTMENT PROCEDURES
3.3.1. TEST EQUIPMENT
The following equipments are required for Electrical Adjustments.
1. Dual-Trace Oscilloscope
- Voltage Range: 0.005-5V/div
- Frequency Range: DC-35MHz
- Probes: 10:1 / 1:1
2. Frequency Counter
- Frequency Range: 0-10MHz
- Probes: 1:1
3. Universal Counter
4. Digital Volt Meter (D.V.M.)
5. Video Sweep Generator
6. Sinewave Generator
7. Video Pattern Generator
8. Monitor TV
9. DC Power Supply
10. VHS Blank Tape
11. VHS Alignment Tape
- Parts No.: VFJ8125H3F(PAL)
3.3.2. VCR SETTING
When no indication in the procedure, set each selector as follows.
15
Summary of Contents for NV-FJ623EC
Page 22: ...10 2 CASING PARTS SECTION 22 ...
Page 23: ...10 3 PACKING PARTS SECTION 23 ...
Page 24: ...11 REPLACEMENT PARTS LIST 24 ...
Page 25: ...11 1 CHASSIS PARTS SECTION PARTS LIST 25 ...
Page 31: ...C1108 ECQB1H223JF3 P CAPACITOR 50V 0 022U 31 ...
Page 37: ...FL7301 VLF0633 FILTER J0HACK000008 37 ...
Page 39: ...L3006 VLQ0599J101 COIL 100UH G0C101JA0026 39 ...
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......