Installation
27
5. Connect the power plug
and grounding.
Ask a service person to do the
grounding work.
In case of a 2-pin power cord,
establish a ground.
6. Check that the washing
machine is level.
The bubble should be at the centre
of the mark.
Mark
Bubble
Leveller
To raise
To lower
If the bubble is out of
the mark
1
Turn the adjustable leg knob
to the left to loosen.
3
Turn to the right to
tighten.
2
Turn the adjustable leg to
eliminate wobble.
7. Perform a trial operation.
Check that there is no water
leakage, abnormal sounds or error
display.
HOT
HOT
COLD
COLD
Water supply
hose
Water supply
valve screw
Power plug
AWW9901D2U03_EN.indd 27
AWW9901D2U03_EN.indd 27
7/2/2563 BE 13:32
7/2/2563 BE 13:32