16
INSTALLATION
1.
Remove the packaging materials and tapes
Remove all transportation packaging materials and tapes. Open the doors and ventilate the unit. If the
outside panels are dirty, clean them with a diluted neutral dishwashing detergent (Undiluted detergent can
damage the plastic components. For the dilution, refer to the instruction of the detergent). After the
cleaning with the diluted detergent, always wipe it off with a wet cloth. Then wipe off the panels with a dry
cloth.
Note:
Remove the cable tie banding the power supply cord. Prolonged banding may cause the corrosion
of the cord coating.
2.
Adjust the leveling feet
Stretch the leveling feet by rotating them as shown in Fig. 1 to contact them to the floor.
Ensure the unit
is installed horizontally.
3.
Fix the unit
Two fixtures are attached to the rear of the frame. Fix the frame to the wall with these fixtures and rope
or chain. (Fig. 2)
4. Setting the shelves
3 shelves are packaged at the bottom of the chamber. Set the shelves on the shelf stoppers at the
standard location firmly. The upward edge should be upside.
5.
Ground (earth)
The ground (earth) is for preventing the electric shock in the case of unexpected deterioration of the
electrical insulation. Always ground the unit at the time of installation.
6. Installation branch circuit breaker
This unit is to be connected to a dedicated circuit protected by branch circuit breaker.
Contact our sales representative or agent.
WARNING
Use a power supply outlet with ground (earth)
to prevent electric shock. If the power supply outlet is
not grounded, it is necessary to install a ground by qualified engineers.
Never ground the unit through a gas pipe, water main, telephone line or lightning rod.
Such
grounding may cause electric shock in the case of an incomplete circuit.
Fig.1
Leveling feet
Fig. 2
Shrink
Stretch
Fixture