background image

© 2012 Panasonic Manufacturing Malaysia Berhad
(6100-K). Unauthorized copying and distribution is a
violation of law.

PMMA120508CE

Vacuum Cleaner

Model No.

MC-CG521RV47-MY
MC-CG521R47-SA
MC-CG521DV47-MY
MC-CG521WV47-MY
MC-CG521R149-PK
MC-CG521R149-LB
MC-CG521R149-LY
MC-CG521R747-NG
MC-CG521R747-KW
MC-CG521R149-OM
MC-CG521R147-AE
MC-CG521R149-JO
MC-CG521R149-EG
MC-CG521R149-AE
MC-CG521R149-QA

Destination:SD2, KUWAIT, NIGERIA AND UAE GEN-

ERAL MIDDLE EAST, PGF, EGYPT, 
AFRICA GENERAL AND MALAYSIA

TABLE OF CONTENTS

PAGE

PAGE

Summary of Contents for MC-CG521RV47-MY

Page 1: ...21RV47 MY MC CG521R47 SA MC CG521DV47 MY MC CG521WV47 MY MC CG521R149 PK MC CG521R149 LB MC CG521R149 LY MC CG521R747 NG MC CG521R747 KW MC CG521R149 OM MC CG521R147 AE MC CG521R149 JO MC CG521R149 EG MC CG521R149 AE MC CG521R149 QA Destination SD2 KUWAIT NIGERIA AND UAE GEN ERAL MIDDLE EAST PGF EGYPT AFRICA GENERAL AND MALAYSIA TABLE OF CONTENTS PAGE PAGE ...

Page 2: ...Disassembly of Upper and Lower Body 7 5 2 Disassembly of Motor Case Set 8 5 3 Disassembly of Cord Reel Unit 9 5 4 Disassembly of Rail Base Unit 9 5 5 Disassembly of Fan Motor Unit 10 6 Exploded View and Replacement Parts List 11 6 1 Exploded View 11 6 2 Attachment Exploded View 12 6 3 Packing Instruction 13 6 4 Replacement Parts List 14 ...

Page 3: ...y 3 0L Automatic Cord Rewind 0 Vac Gauge 0 Exhaust Filter NORMAL Extension Wands METAL EXTENSION WAND Blower Operation 0 Floor Nozzle NORMAL OTHERS 2 STEP MALAYSIA ONLY Dust Bag CLOTH BAG OTHERS PAPER BAG MALAYSIA ONLY Dimension H x W x L mm 240mm X 304mm X 450mm Net Weight 4 5 KG Cord Length 5 0M OTHERS 6 0M MALAYSIA ONLY Cleaning Tools CREVICE TOOL DUSTING BRUSH ...

Page 4: ...4 3 Wiring Connection ...

Page 5: ...5 4 Trouble Shooting Chart ...

Page 6: ...6 ...

Page 7: ... Body Step 1 Open Dust Cover remove Dust Bag Step 2 Release Dust Cover from Hanger Step 3 Remove 2 screws from the Front Side Step 4 Release 2 catches using Philip Screwdriver Step 5 Remove Body Cover Step 6 Take out Filter sponge Step 7 Release 4 catches to take out the pedal ...

Page 8: ... Step 8 Remove 4 screws from Body Lining Upper Step 9 Take out Upper Body from Lower Body 5 2 Disassembly of Motor Case Set Step 1 Pull out the On Off Switch Step 2 Pull up Motor Case Set from Lower Body ...

Page 9: ...ase Unit by insert a slotted screwdriver into the shaft of the Cord Reel Unit and turning it 90 counter clockwise Step 2 Remove Cord Reel Unit from Rail Base Unit To assemble Turn the Cord Reel Unit holding on the plug Number of turns for pretension of the Cord is engraved on the steel at the side of Cord Reel Unit Step 1 Assemble in reverse order of the disassembly Step 2 Pretension the Cord Reel...

Page 10: ...10 5 5 Disassembly of Fan Motor Unit Step 1 Pull up Motor Set Step 2 Remove Silicon Cloth Step 3 Disconnect 2 Wire Terminals Step 4 Remove Motor Support Rubbers ...

Page 11: ...eplacement Parts List 6 1 Exploded View B26 B28 B27 B23 B25 B3 B21 B11 B9 B10 B8 B13 ALL EXCEPT MALAYSIA MALAYSIA ONLY B13 B15 B20 B17 B5 B19 1 B24 B29 B20 B2 2 3 3 3 3 B2 B1 B22 Plug 3 B16 B7 B12 1 B14 B4 B6 Plug C3 Plug E2 3 ...

Page 12: ...12 6 2 Attachment Exploded View A7 A8 A5 A4 MALAYSIA ONLY ALL EXCEPT MALAYSIA A6 A6 A1 A2 A3 ...

Page 13: ...13 6 3 Packing Instruction HOSE UNIT EXTENSION WAND UNIT CONNECTION PIPE CURVED WAND COMPLETE SET FLOOR NOOZLE ASS Y A FLOOR NOOZLE ASS Y DUSTING BRUSH A CREVICE NOZZLE NOZZLE HOLDER P1 P2 P2 ...

Page 14: ...KDN000 DUST COVER PACKING 1 B20 YMV01CAQ080 WHEEL 2 B21 YMV99NDQ00C CORD REEL UNIT 1 C3 PLUG SD2 KUWAIT NIGERIA AND UAE B21 YMV99NDQ000 CORD REEL UNIT 1 E2 PLUG GENERAL MIDDLE EAST PGF EGYPT AND AFRICA GENERAL B21 YMV99NCH00V CORD REEL UNIT 1 BF PLUG MALAYSIA B22 YMV96ADN000 BODY PARTITION UNIT 1 SD2 KUWAIT NIGERIA AND UAE B23 YMV05EDN000 SWITCH PEDAL 1 B24 YMV46NDN000 BRAKE PEDAL 1 B25 YMV24ADS0R...

Reviews: