1. Install 1st Cam Pin to Cam Barrel Unit
with adjusting the rotational phase
as the 2-5 Cam Pin penetrates.
2. Install 1st Lens Frame Unit to Cam Barrel Unit
with adjusting the rotational phase
as shown
▲
marking
in the figure.
3. Tighten screw (H) by using the torque driver with specified torque.
- Screw(G)
×
3
- Torque : 15
±
1Ncm
4. Glue the 1st Cam Pin with “Three Bond 1401B or 1401C”
<Caution>
- The glue does not come out above the 1st Lens Frame Unit
- Make sure the Glue has hardened before proceeding installation
* Standard time for curing : 3 to 5 hours
Screw(H)
5.8mm
BLACK
1st Lens
Frame Unit
1st Lens
Frame Unit
Front
side
Rear
(body)
side
6.2.2.3. Installation of the 1st Lens Frame Unit
1st Cam Pin
<Note>
- At this illustration,
the lens of front side is upward.
But it is easier to work with the rear side up.
The position of ▲ depends on
the position of the cam frame.
At Wide end, ▲ will be at here.
4
4