117
4-6 Basic Control Timing Chart
ンㄆㄇㄆㄓㄆㄏㄆ
• ON/OFF on the timing chart refers to ON/OFF operations. It does not refer to the voltage level (High/Low).
• In the following timing charts, the timing of output operation corresponding to each input has a small delay of 0ms or
more.
4-6-1 Flow from startup to marking
T1
T5
T2
T4
T4
T7
T6
T3
T3
T3
T3
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
(Open)
(Close)
ON
OFF
(Close)
(Open)
ON
OFF
(Normal)
(Error)
ON
OFF
(Normal)
(Error)
REMOTE IN (X4)
*1
LASER SUPPLY IN (X6)
SHUTTER ENABLE IN (X9)
SHUTTER IN (X8)
TRIGGER IN (X5)
SYSTEM STANDBY OUT
(Y7)
REMOTE OUT (Y4)
LASER STANDBY OUT (Y6)
LASER SUPPLY OUT (Y20)
ALARM OUT (Y15)
WARNING OUT (Y14)
READY OUT (Y5)
PROCESSING OUT (Y10)
LASING OUT (No.40)
PROCESSING END OUT
(Y11)
SHUTTER CLOSE 1 OUT (Y8)
SHUTTER CLOSE 2 OUT (Y9)
Key Switch
*1 : Turn off the key switch with the laser pumping turned off or with the shutter closed.
ME-LPRH-SM-3
Summary of Contents for LP-RH Series
Page 19: ...1 Product Overview ME LPRH SM 3...
Page 42: ...2 Laser Marker Installation ME LPRH SM 3...
Page 68: ...3 Operation Method ME LPRH SM 3...
Page 90: ...4 External Control Using I O ME LPRH SM 3...
Page 138: ...5 External Control by Communication Commands ME LPRH SM 3...
Page 147: ...6 Link Control with External Devices ME LPRH SM 3...
Page 172: ...7 Maintenance ME LPRH SM 3...
Page 201: ...Troubleshooting ME LPRH SM 3...
Page 236: ...Index ME LPRH SM 3...
Page 239: ......